Laserfiche WebLink
I <br />,I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br />CASE <br /> <br /> HIGHWAY #10 SEWER AND WATER <br /> ~HA~GE ORDER NO. 1 AND FIRST PARTIAL PAYMENT <br /> By: Steven J. Jankowski, City Engineer <br /> <br />Background':: <br /> <br />The Highway gl0 Sewer and Water Project was awarded November 1991 at the bid price of <br />$138,150.20. ~t'the present time, the project is complete with the exception of final pavement and <br />turf restoratio't, partial payment No. 1, enclosed, represents payment for the installed quantities. <br />Most item qu ratifies compare exactly with the estimated quantities in the bid; however, some <br />changes were;necessitated due to field conditions. A manhole was added to avoid conflicts with <br />existing stru¢l ureSland utilities and the watermain was relocated to the opposite side of that planned <br />to avoid un~rm!ning a structural canopy alongside ParaBody's loading dock. The other <br />deviations it~,Olvegl~ modifications caused by connection to existing septic tank discharges. During <br />the course of ,!he !l~roject, more existing tanks were discovered which consequently required more <br />connections a~d p~pe. <br /> <br />Also during t.he course of the project, J.R.'s Saloon indicated a desire to provide a two-inch copper <br /> I 'ce ~ the one-inch service specified to insure adequate reserve future <br />service in p~_ ~ ........ capacity for <br />expanded use. The addmonal costs for this modJficanon were sohmted from the contractors and <br />presented tothe O~ner of J.R.'s Saloon before the change was authorized. The cost of this change <br />totals $4,88~..25 las detailed in Richard Knutson, Inc.'s, letter of April 14, 1992. All costs <br />associated With Services will be assessed directly to the benefited property as opposed to being <br />charged ag~iflst ~e general project and being divided among the project beneficiaries. In addition, <br />the contract0? has submitted a payment request in the amount of $330 for two hours of labor and <br />machine time)~to !6cate the existing end of the main which was located approximately 20 feet farther <br />than it was:i,fidi¢fi,ted on the as-built plans. In addition, the actual plug location was in an area <br />congested by~ a.gas main and five telephone and cable television cables, as opposed to the <br />unencumberekt area anticipated on the plans. <br /> <br />Change order No. 1 will increase the project contract $5,213.25. The additional quantities <br />contained ih:Pay: ,l~stimate No. 1 will increase the contract amount an additional $1,099.81. <br /> <br />RecommenOati0n: <br />I recommend adOpting the enclosed resolution approving Project #91-01 Change Order No. 1 and <br />approving p ~ae-~ial !Pay Estimate No. 1. <br /> <br />Council ACtion: <br /> <br />Motion to adopt JResolution g'92-05-.. . approving Change Order No. 1 and partial payment to <br />Richard Kt~u..isoni Inc. for Improvement Project 09 D01. <br /> <br />Copies also distributed to: <br /> <br />Review Checklist: <br /> <br />City Engineer <br /> <br />CC: 05/12 92 <br /> <br />City Administrator <br />Finance Officer <br />Project Manager <br /> <br /> <br />