My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/12/1992
Ramsey
>
Public
>
Agendas
>
Council
>
1992
>
Agenda - Council - 05/12/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 8:59:38 AM
Creation date
7/23/2003 11:51:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/12/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE <br /> <br /> HIGHWAY #10 SEWER AND WATER <br />CHANGE ORDER NO. 1 AND FIRST PARTIAL PAYMENT <br />By: Steven J. Jankowski, City Engineer <br /> <br />Backgroun!d: <br /> <br />The HighwaY #~10 Sewer and Water Project was awarded November 1991 at the bid price of <br />$138,150.2,0; At~ the present time, the project is complete with the exception of final pavement and <br />turf restoration, iPartial payment No. 1, enclosed, represents payment for the installed quantities. <br />Most item iqgantities compare exactly with the estimated quantities in the bid; however, some <br />changes were neCessitated due to field conditions. A manhole was added to avoid conflicts with <br />existing stnj0~tur~s and utilities and the watermain was relocated to the opposite side of that planned <br />to avoid u~{lermining a structural canopy alongside ParaBody's loading dock. The other <br />deviations hr~,olved modifications caused by connection to existing septic tank discharges. During <br />the course 0~ the~project, more existing tanks were discovered which consequently required more <br />connections and pipe. <br /> <br />Also during the course of the project, J.R.'s Saloon indicated a desire to provide a two-inch copper <br />service in place Of the one-inch service specified to insure adequate reserve capacity for future <br />expanded us~s. The additional costs for this modification were solicited from the contractors and <br />presented t0 the owner of J.R.'s Saloon before the change was authorized. The cost of this change <br />totals $4,883.25 as detailed in Richard Knutson, Inc.'s, letter of April 14, 1992. All costs <br />associated with s~ervices will be assessed directly to the benefited property as opposed to being <br />charged agai0st the general project and being divided among the project beneficiaries. In addition, <br />the contractOt has submitted a payment request in the amount of $330 for two hours of labor and <br />machine time;'to locate the existing end of the main which was located approximately 20 feet farther <br />than it was i/¢di¢~tted on the as-built plans. In addition, the actual plug location was in an area <br />congested by a gas main and five telephone and cable television cables, as opposed to the <br />unencumbered area anticipated on the plans. <br /> <br />Change Order No. 1 will increase the project contract $5,213.25. The additional quantities <br />contained in Pay Estimate No. 1 will increase the contract amount an additional $1,099.81. <br /> <br />Recommendatiou: <br /> <br />I recommend [ado, pting the enclosed resolution approving Project #91-01 Change Order No. 1 and <br />approving pa~ial Pay Estimate No. 1. <br /> <br />Council ACtion: <br /> <br />Motion to a~10pt Resolution #92-05- approving Change Order No. 1 and partial payment to <br />Richard KnutSon, Inc. for Improvement Project #91-01. <br /> <br />Review Checklist: <br />City Engineer <br /> <br />CC: 05/12/92 <br /> <br />Copies also distributed to: <br /> <br />City Administrator <br />Finance Officer <br />Project Manager <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.