My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 12/18/2007 - No Meeting
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2007
>
Agenda - Public Works Committee - 12/18/2007 - No Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 2:57:51 PM
Creation date
12/14/2007 3:35:01 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Title
No Meeting
Document Date
12/18/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Chair Elvig stated that he is comfortable with sending out the survey and getting feedback from <br />residents. <br /> <br />Councilmember Dehen outlined some changes he would like to make to the wording of the letter <br />and survey. <br /> <br />Case #4: <br /> <br />Consider Establishing Topsoil Requirements in New Subdivision <br /> <br />Chair Elvigdeferred this discussion to the next meeting, due to time constraints. <br /> <br />Case #5: <br /> <br />Update on Ermine Boulevard Storm Sewer Project <br /> <br />Chair Elvig deferred this discussion to the next meeting, due to time constraints. <br /> <br />COMMITTEE INPUT <br /> <br />Update on Highlands at River Park Pond <br /> <br />City Engineer Jankowski stated that staff was directed at the October Public Works Committee <br />meeting to investigate potential causes of leaks in the River Park Pond and also to have the City <br />Attorney determine the City's ability to use the developers escrow to correct the leaking <br />problem. He stated that staff has ordered additional dye and has done from private investigation <br />to the elevation of retaining walls constructed on private property adjacent to the ponds. He <br />stated that at least one of the retaining walls has been constructed lower than the pond liner <br />elevation and found fragments of pond liner material adjacent to the retaining wall. He stated <br />that there were also some monuments that have been pounded through the liner. He stated that <br />the City has also been monitoring the elevation of the pond and, as of yesterday, it was at 856.7 <br />feet, which means there is less than 2 feet of water in the pond. He stated that the City Attorney <br />feels that the escrow funds were earmarked for inspection purposes only, so he does not feel the <br />City can use the remaining funds to correct the leaking problems, because the City has already <br />accepted the pond. <br /> <br />Chair Elvig asked ifthe City was aware ofthe leaking problem when the pond was accepted. <br /> <br />City Engineer Jankowski stated that the City was not aware of the leaking problem at that time. <br /> <br />Chair Elvig asked what the latest results were ofthe dye testing. <br /> <br />City Engineer Jankowski stated that they have not used the dye again because in order to <br />administer it according to directions, the pond would need to be filled up at a cost of about <br />$3,000, additional dye would be needed ata cost of $2,500 and there is still no guarantee that the <br />leaks could be located. He stated that the developer has been in contact with the residents and <br />has indicated an interest in doing something to remedy the situation. <br /> <br />Scott Rothrum, 15370 Xcimo Street, stated that that although he does not want to speak for the <br />developer, he is under the impression that the developer was going to send an e-mail to the City <br /> <br />Public Works. Committee INovember 20, 2007 <br />Page 8 of9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.