Laserfiche WebLink
<br />The Planning. Commission met on December 6, 2007, and recommended approval of the site <br />plan, contingent upon staff and the applicant working out the details with regard to landscaping <br />and the trail location, with the strong preference that the trail be completed. The minutes are <br />included in your packet. <br /> <br />Council Action: <br /> <br />Motion to approve the proposed site plan contingent upon compliance with City Staff Review <br />Letter dated November 30, 2007, revised January 3, 2008, specifically addressing the below <br />Issues: <br />1) Construction of the appropriate portion of the regional trail along the south side of <br />Bunker Lake Boulevard, and located within the boundaries of the development; <br />2) Installation of adequate landscaping, as required by the Environmental <br />Coordinator to properly screen the loading dock area from Bunker Lake <br />Boulevard. <br /> <br />Review Checklist: <br />Interim Asst. CD Direc <br /> <br />clr? <br /> <br /> <br />-219- <br />