Laserfiche WebLink
• Background: <br />Staff stated that some of the changes for the street maintenance program is for sealcoating, the <br />City will move to using granite chips because there is a stockpile of pea rock and staff would like <br />to use this for sealcoating projects in parks. <br />The following is the cost difference from using pea rock and granite chip. <br />It will cost about 20% more, but the City has had problems with pea rock flying all over and <br />there has also been having this problem on cul de sacs, so they are plamiing to move to using <br />asphalt with a polymer on cul de sacs and MSA streets. The City will also begin the new <br />assessment program which will be decreased by 1/7 over the next 7 years. The feasibility study <br />should be ready by the first meeting in February and then the public hearings can be scheduled. <br />There will also be information nights scheduled where residents can come and talk about the <br />projects informally. <br />Action: <br />No action needed. <br />COMMITTEE INPUT <br />• Reviewed by: <br />City Administrator: <br />Public Works Dire&r/Pnncipal City Engineer <br />City Engineer <br />Assistant City Engineer <br />Civil Engineer II <br />CC: 02/12/08 <br />-123- <br />