Laserfiche WebLink
<br />It should be noted that requesting proposals does not obligate the City to construct the tower; <br />staff is only requesting authorization of a RFP for engineering services at this time. . This item <br />will be brought back to the City Council many times throughout the process to update you on the <br />progress and findings, and to request approval of specific items (acceptance of a consultant, <br />authorization/acceptance of a Feasibility Study, ordering plans and specs, etc.). <br /> <br />Funding: <br /> <br />The engineering services for this project, as well as the infrastructure itself, will be funded solely <br />from the water utility fund. <br /> <br />Recommendation: <br /> <br />City staff recommends that the Public Works Committee recommend to the City Council <br />authorization to prepare a RFP for engineering services to assist in the design and cons:truction of <br />water tower #3 in Elmcrest Park. A copy of the proposed RFP will be available at the meeting. <br /> <br />Reviewed By: <br />Public Works Director/Principal City Engineer <br /> <br />PW: 2/19/08 <br /> <br />12 <br />