Laserfiche WebLink
Street betw¢¢m 149th Avenue N.W. and 150th Avenue N.W. in exchange for the City installing a <br />roadway. TOis Segment of roadway is part of the designated MSA system. Plans have been <br />prepared byi~e City Engineering Department and are currently in the process of receiving approval <br />from the Stit~ Aid Office at Mn/DOT. The project is estimated to have a construction cost of <br />$57,500 witha total project cost of $74,700. All of these project costs will be funded through the <br />MSA consmletion portion of the City's annual allotment which totals $312,981 for 1992. The <br />project conSi.~ts of approximately 700 feet of 42 foot roadway with concrete curb and gutter. In <br />addition, the project contains approximately 450 feet of 18 inch storm sewer to drain the roadway. <br />Plans were presented. <br /> <br />Case #4: Response to Public Hearing Comments on 1992 Street Program. <br /> <br />Due to lack of a'~ailable time because of the City Council meeting, this case will be rescheduled for <br />the April 28, :1992 meeting. <br /> <br />ADJOURNMENT <br /> <br />The Road and Bridge Committee adjourned at 7:00 p.m. <br /> <br />Respectfully :s.ubmitted., <br />City Engineor <br /> <br />Road and Bridge Committee / April 14, 1992 <br /> Page 2 of 2 <br /> <br /> <br />