Laserfiche WebLink
b. Type of sign. <br />c. Type of construction materials to be used. <br />d. Location of building, structure or parcel to which, or upon which, the sign is <br />to be attached or erected.. <br />e. Position of the sign or other advertising structures in relation to the nearest <br />buildings, structures, public streets, right-of--ways and property lines, along <br />with location and square footage areas for all existing. signs on the same <br />premises. The drawing showing such position shall be prepared "to scale." <br />f. Blueprint or ink drawing of the plans and specifications, and method of <br />construction or attachment to the building or in the ground, including all <br />dimensions, locating all light sources, wattage, type and color of lights and <br />details of any light shields or shades. <br />g. Copy of stress sheets and calculations, showing the structure is designated <br />for dead load and wind velocity in the amount required by this and all other <br />ordinances of the City, if required by the Zoning Administrator or Building <br />Official. The Zoning Administrator or ,Building Official may require <br />additional information concerning safety. <br />h. An agreement with the. City which would authorize and direct the City of <br />Ramsey to remove the sign and sign structure, at the expense of the <br />applicant, where maintenance is required and the maintenance is not <br />furnished, but only after a notice of sixty (60) days specifying the <br />maintenance required by the City. . <br />9.12.18 Permit Issuance or Denial <br />Subdivision 1. The Zoning Administrator shall issue a permit for the erection, <br />alteration, or relocation of a sign within fourteen (14) days of receipt of a completed application <br />and non-refundable application fee provided that the sign complies with all applicable laws and <br />regulations of the City. <br />Subd. 2. When a permit is denied, written notice shall be provided to .the <br />applicant along with a brief statement of the reasons for denial. The Zoning Administrator 'or <br />Building Official may suspend or revoke an issued permit for- any false statement or <br />misrepresentation of fact in the application. <br />9.12.19 Refunds <br />.Subdivision 1. If an issued permit is withdrawn by the applicant within ninety <br />(90) days of issuance, and if no inspections have been made and no work authorized by the <br />-205- <br />