My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/14/2008
Ramsey
>
Public
>
Agendas
>
Council
>
2008
>
Agenda - Council - 10/14/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 9:35:58 AM
Creation date
10/10/2008 2:44:46 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/14/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommendation: <br />Staff recommends the following. <br />1? 03.31 Chameleon Street paving -0 <br /># Affirm proposed full unit assesstnent for vacant property. <br />+ Direct staff to review the grades at 17410 Chameleon to determine whether the planned <br />drainage improvements should be modified, <br />?P 08-34151' Ave, 152"d Ave & Fluorine St Paving <br />Direct staff to poll properties close to the existing sanitary sewer on the frontage road to <br />see whether it is feasible to extend sewer and water to a portion of the project area. <br />+� Direct staff to remove the closure of 152"4 Ave at TH 47 from the scope of the <br />improvements„ <br />+ A.ffirm.the retention of the connection of lag"d Avenue to Helium Street within the scope <br />of the improvements. <br />• Direct staff to review an alternate location with the affected property owner for the <br />relocation of the storm sewer outfall, <br />+� ,Affirm proposed equal assessment for corner properties on the frontage road. . <br />1P 08.33 Ute Stredt Paving <br />+ Direct staff to locate property corny l and proposed edge of the roadway as proposed by <br />the study including the approximate edges of the cul da sac bulb. <br />+ �A,ffirm the proposed street width of 18 feet or direct staff to prepare hardship criteria far <br />deviating from this standard. <br />+ Direct staff to review an alternate location with the affected property owner for the storm <br />sewer outfall and add inlet pipes to drain the properties at the corner of 179'h Lane. <br />Action; <br />Motion, to rccommend to the City Council the staff recommendations outlined above, <br />Reviewed By: <br />Director of Public Works/Principal City Engineer <br />,Police Chief <br />Fire Chief <br />Public Works Street Supervisor <br />Assistant City l~ngincer <br />City Attorney <br />PW: 09/16/08 <br />—118— <br />
The URL can be used to link to this page
Your browser does not support the video tag.