Laserfiche WebLink
CITY OF RAMSEY <br />DEVELOPMENT PERMIT <br />RAMSEY COMMON$ <br />On May 13, 2008, Site Plan approval was granted by the City of Ramsey ("City") to Ramsey -Arbor <br />Properties, LLC, ("Permittee"), whose address is 8035 Riverdale ,Drive, Ramsey MN 55303, to <br />construct a 7,800 square -foot multi -tenant office facility ("Structure") on the property which is legally <br />described as follows; <br />Lot 1, Block 1, Alpaca Estates, Anoka County, Minnesota <br />the ("Site"). <br />This approval is issued pursuant to §9,03,06 of the City Code. The conditions of this approval are as <br />follows; <br />1. STRUCTURE. All building plans must be prepared and certified by a registered engineer or <br />architect. <br />2. STATE BUILDING CODE COMPLIANCE. The structure shall be constructed in <br />accordance with the requirements of the State Building Code. <br />3. SITE PLAN COMPLIANCE. The structures shall be constructed on the Site as shown on the <br />Site Plan submittal prepared by C,M. Architects dated March 3, 2008, revised .May 9, 2008. <br />Amendment will be considered using criteria outlined in City Code review standards. <br />4. REQUIRED IMPROVEMENTS. The Permittee shall construct and install the following site <br />improvements on the Site in accordance with the specifications and location as shown on the <br />Site Plan submittal and in accordance with City Code. The City Engineering Department <br />requires the submittal of a complete set of Construction Plans for review and approval prior to <br />beginning construction on the site. The Required Improvements are as follows: <br />a. Site grading in accordance with the Grading Plan prepared by Anderson Engineering dated <br />February 28, 2008, revised May 6, 2008. <br />b. Installation of concrete and bituminous .driveways and parking lot per City standards. <br />c. Installation of storm sewer and appurtenances per City standards. <br />d. Installation of B-6/12 continuous concrete curbing around the perimeter of all concrete <br />and/or bituminous surfaces. <br />e. Establishment of turf in areas disturbed during construction and in accordance with the Site <br />Plan. <br />f. Installation and removal of temporary erosion control measures. <br />g. Installation of landscaping materials in accordance with the Landscape Plan prepared by <br />Westwood, Professional Services dated February 29, 2008, revised May, 1, 2008. <br />h. Irrigation metering and backflow devices shall be approved as part of the Utility Plan, and <br />installed accordingly. <br />is Irrigation rain sensors shall be installed and appropriately placed throughout the <br />development. <br />_351— <br />