Laserfiche WebLink
CASTE # I 1 <br />IRRIGATION FOR RIVERDALE PARK — 2008 PARKS CAPITAL IMPROVEMENT <br />By: Mark Riverblood, Parks Supervisor <br />Background: <br />The 2003 Parks Capital Improvements Program (GIP) identifies irrigation as a need for <br />Riverdale Park, As Council may recall, earlier this year, the Park and Recreation Commission <br />forwarded a work plan that requested this project be considered for construction in the fall of <br />2003, At their regular October meeting, the Commission recommended proceeding with this <br />project relative to the budget estimate below. <br />The impetus for this project is that during dry periods the turf quality declines substantially, <br />resulting in a park space that is unattractive and underutilized, In addition; the park has been the <br />subject of significant volunteer tree planting contributions, (with many of the park trees <br />negatively affected during droughty periods). The most recent tree planting was the 2008 Arbor <br />Day collaboration between the Environmental Policy Board and Village Bank of Ramsey, <br />Further, neighbors of the area have been watering trees for many years with garden hoses relative <br />to a concern for the trees. <br />Observations: <br />The 4 -acre Riverdale Park was dedicated to the city as part of the platting of the Rivenwick <br />single family home subdivision along the Mississippi River in the 1990's. The park's primary <br />purpose is to serve as a neighborhood resource for those residents south of Hwy's # 10 & # 169 <br />near the future Mississippi West Regional Park, and Ramsey's boundary further to the east. <br />Since the initial construction of the park, many townhome units have been platted and are now <br />occupied to the west of Riverdale Park. The attached Logis map demonstrates the proximity of <br />the hundreds of families who will benefit from these improvements to the park. <br />Also attached are the CIP worksheet, and the schematic of the proposed irrigation project. Below <br />are the estimated construction costs of this project, as well as the annual anticipated operational <br />expenses. <br />Irrigation Detail <br />Irrigation, 12 -zone, 2 -wire system $33,000 <br />Waterrnain connections, concrete pad, RPZ $9,000 <br />Electric service (Connexus) $1,600 <br />Meter socket and minor electrical $900 <br />Contingency $500 <br />Trenching, blacktop repair, restoration etc. by city forces N/C <br />Total $45,000 <br />—361 <br />