Laserfiche WebLink
-180- <br /> <br />10. <br /> <br />11. <br /> <br />i2. <br /> <br />($3,658.00) per commercial acre. The amount of Stormwater Management Fee due on <br />the Site is ($6,328.00) (1.73 acres x $3,658/acre). A cash payment will be required prior <br />to the CITY releasing the Building Permit. <br /> <br />FIRE LANES. Fire lanes shall be maintained on the Site. The exact location of these <br />items on the Site shall be as directed by the City's Fire Chief. <br /> <br />LIGHTING. Aa-ty lighting installed on the structure or in the parking lot is subject to the <br />prior approval of the City Engineer and shall be designed so as to deflect light away from <br />all adjacent parcels. Bulbs emitting in excess of 3,000 lumens (150 watts) shall be so <br />directed that the bulb is not visible from off of the property where such light source is <br />located <br /> <br />BUILDING FACADE. The Permittee agrees to' face the Structure with integrally color <br />treated rockface concrete block, the gable ends will be finished with maintenance free <br />vinyl siding, and asphalt shingles for the roof, in accordance with the Exterior Elevations <br />prepared by Lampert Architects dated April 9, 1998,' revision date October 13, 2000. <br /> <br />REQUIREMENTS FOR BUILDING PERMIT AND CERTIFICATE OF <br />OCCUPANCY. No building permit for the Site will be issued until the permittee has: a) <br />signed and returned this Development Permit; b) provided the required cash-payment for <br />stormwater management in accordance with Item #6 of this Permit; c) provided the <br />required financial guarantee in accordance with Item #12 of this Permit; and d) provided <br />the City with a copy of the Grading and Drainage Permit issued by the Lower Rum River <br />Water Management Organization. No Certificate of Occupancy for the structure will be <br />issued until: a) the Required Improvements are accepted by the City; and b) the <br />landscaping maintenance guarantee has been provided in accordance with Item #13 of <br />this Development Permit. <br /> <br />IMPROVEMENT CONSTRUCTION SCHEDULE. The Required Improvements <br />shall be completed before October 24, 200 I. <br /> <br />ESCROW FOR REQUIRED IMPROVEMENTS. In order to ensure the installation <br />of the Required Improvements in accordance with City specifications and in a timely <br />manner, the Permittee shall be required to deposit with the City a cash escrow or letter of <br />credit, approved as to form by the City, in the amount of Seven Thousand Dollars and no <br />cents ($7,000) which is 150% of the City's estimated cost of the Improvements. Prior to <br />the issuance of the building permit, ali financial guarantees must be provided as required <br />herein. <br /> <br />Upon completion of the construction of the Required Improvements, the financial <br />guarantee shall be returned to the Permittee and the Permittee shall be required to provide <br />the landscaping maintenance guarantee described in Item #13 of this Development <br />Permit. The determination of completion of the construction of the Required <br />Improvements shall be made by the City Council after consultation with the City <br />Engineer. In the event the Permittee fails to construct and install the Required <br /> <br /> <br />