Laserfiche WebLink
STATEMENT OF WORK CERTIFIED <br /> <br /> STATE OF MINNESOTA - DEPARTMENT OF T93~NSPORTATION <br /> <br />MAIN BODY ITEMS (Group Level Detail) <br /> <br /> m <br /> Voucher No. 4 Sheet No: 12 · <br /> Item Contract Unit Con~ract Contract To Dace To DaC~ Orp LAne <br /> <br />2506.502 CONST DP~AINAGE STRUC~E DESIGN SPEC EACH 5,750.00 !.0Q 3,750.00 1.00 3,750.00 002 1060 <br /> Totals for Proposal Line Number 1060 1.00 $3,750.00 1.00 $3,750.00 <br /> <br />2506.516 ~STING .ASSEMBLY EAC~ <br />2506.516 CASTING ASSEMBLY EACH <br />2506.516 CASTING ASSEMBLY. EAC~ <br />2506.516 CA~TING ASSEMBLY EACK <br /> <br /> Totals for Proposal Line Number 1070 <br /> <br />470.00 104.00 48,880.00 39.00 18,330.00 002 1070 <br />470.00 4.00 1,880.00 2.Qb 940.00 004 [070 <br />470.00 lO.00 4,700.00 0.00 0.00 006 1070 <br />470.00 13.00 6,110.00 O.0O 0.00 007 1070 <br /> 131.00 $61,570.00 41.00 $19,270.00 <br /> <br />2506.522 ADJUST FRAME & RING C~STING EACH 300.00 !i.0Q 3,300.00 0m00 0.00 001 !080 <br /> Totals for Proposal Line Number i080 ll. Q0 $3,300.00 0.00 $0.00 <br /> <br />2506.602 CO~ECT I~O EXISTING ,MANHOLE EACH 720.00 2.00 1,440.00 2.00 1,440.00 007 1090 <br /> Totals for Proposal Line Number 1090 2,00 $1,440.00 2.00 $1,440.00 ~/ <br /> <br />2506.602 CONSTRUCT S~NITARY MA~N~qOLE SPECIAL EACH 1,645.73 11.00 18,103.03 10.00 16,457.30 007 1100 <br /> Totals for Proposal Line Number ll0Q 11.00 $18,103.03 10.00 $16,457.30 <br /> <br />2506.603 CONSTRUC~ S~NiTARY ,v~N~OLES M 268.87 14.00 3,764.18 10.94 2,941.43 007 1110 <br /> Totals for Proposal Line Number 1110 14.Q0 $3,764.18 10.94 $2,941.43 <br /> <br />2506.603 RECONSTRUCT SANITARY MA/~OLES M 500.00 4.90 2,450.00 0.00 0.00 001 1120 <br /> Totals for Proposal Line Number ~120 4.90 $2,450.00 Q.00 $0.00 <br /> <br />2511.501 R~OM RIPRAP CLASS III M3 73.08 62.~0 4,538.26 58.20 4,253.25 002 1130 <br /> Totals for Proposal Line Number 1130 62.10 $4,538.26 58.20 $4,253.25 <br /> <br />2521.501 75 MM CONCRETE WA~LK M2- 21.26 4,085.00 86,847.10 0.00 0.00 QQ1 1140 <br />2521.501 75 MM CONCRETE WALK M~= 21.26 398.00 8,461.48 0.00 0.00 0Q3 1140 <br />Totals for Proposal Line Number 1140 4,483.00 $95,308.58 0.00 $0.00 <br /> <br />2521.501 !00 MM CONCRETE WA~LK M2 22.38 139.00 3,110.82 0.00 0.00 001 1150 <br />252!.501 10Q MM CONCRETE WALK M2 22.38 709.00 1~,867.42 Q.00 0.00 005 !150 <br />Totals for Proposal Line Number 1150 848.00 $18,978.24 0.00 $0.00 <br /> <br />2521.501 150 MM CONCRETE WALK M2 29.66 43.00 1,275.38 6.00 177.96 001 1160 <br />2521.501 150 MM CONCRETE WALK M2 29.66 12.00 355.92 6.30 186.85 003 1160 <br />To~a!s for Proposal Line Number !160 55.00 $1,631.30 !2.30 $364.81 / <br /> <br />~OW SmP. NL~4BER t99--010--03 <br /> <br />FOR WORK COMPLETED AS OF 09/26/2000 <br /> <br />Con~rac~ Number: Z00516 <br /> <br />-82- <br /> <br /> <br />