|
STATEMENT OF WORK CERTIFIED
<br />
<br /> STATE OF MINNESOTA - DEPARTMENT OF TPJkNSPORTATION
<br />
<br />MAIN BODY ITEMS (Group Level Detail)
<br />
<br /> Voucher No. 4 Sheet No: 13
<br />
<br /> Item Contract Unit Contract Contract To Date To Date Grp Line
<br /> Number Item Unit Price Quantity Amount Quan~i~y Amount No. No.
<br />
<br /> 2521.511 50 M~4 5I%-tR4INOUS WAL, K M2 6.30 2,965.00 18,679.50 0.00 0.00 001 1170
<br />
<br /> Totals for Proposal Line Number 1170 2,965.00 $18,679.50 0.00. $0.00
<br />
<br /> 2531.501 CONCRETE CURB & GUTTER DESIGN B412 M 21.28 428.00 9,107.84 59.00 1,255.52 003 1180
<br /> Totals for Proposal Line Number 1180 428.00 $9,107.84 59.00 $1,255.52
<br />
<br /> 2531.501 CONCRETE CURB & GUTTER DESIGN 8418 M 24.79 168.00 4,164.72 165,00 4,090.35 003 1190
<br /> Totals for Proposal Line Number 1190 168 . 00 $4,164.72 165.00 $4,090.35
<br />
<br /> 2531.501 CONCRETE CURB & GUTTER DESIGN 8424 M 26.10 8,515.00 222,241.50 5,960.00 155,556.00 001 !200
<br /> Totals for Proposal Line Number 1200 8,515.00 $222,241.50 5,960.00 $155,556.00
<br />
<br /> 2531.501 CONCRETE CURB & GIYFTER DESIGN 8618 M 22.85 1,096.00 25,043.60 146,00 3,336.10 001 1210
<br /> 2531.501 CONCRETE C~/RB & GU~ER DESIGN 8618 M 22.85 886.00 20,245.10 0.00 0.00 005 1210
<br />
<br /> Totals for Proposal Line Number 1210 1,982.00 $45,288.70 146.00 $3,336.10
<br />
<br /> 2531.502 CONCRETE CU~ DESIGN S5 M 35.70 84.00 2~998.80 0.00 0.00 001 1220
<br /> Totals for Proposal Line Number 1220 84.80 $2,998.B0 0.00 $0.00
<br />
<br /> 2531. 507 200 MM CONCRETE DRIVEWAY PAVEMENT M2 42.84 228.30 9,780.37 0.00 0.00 001 1230
<br /> Totals for Proposal Line Number 1230 228.30 $9,780.37 0.00 $0.00
<br />
<br /> 2540.602 MAIL 8OK SUPPORT F~ACH 125.00 4.00 500.00 0.00 0.00 001 1240
<br />I Totals for Proposal Line Number 1240 4.00 $500.00 0.00 $0.00
<br />
<br /> 2545,509 CONDUIT SYSTEM (SIGNA~LS) LS 14,362.00 0.80 11,489.60 0.40 5,744.80 001 1250
<br /> 2545,509 CONDUIT SYSTEM (SIGNALS) LS 14,362.00 0.10 1,436.20 0.05 718.10 003 1250
<br /> 2545.509 CONDUIT SYSTEM (SIGNALS) LS 14,362.00 0.10 1,436.20 0.05 718.10 005 1250
<br />
<br /> Totals for Proposal Line Number 1250 1.00 $14,362.00 0.50 $7,181.00../
<br />
<br /> 2554.509 GUIDE POST TYPE 8 EACH 37,00 38.00 1,406.00 0.00 0,00 002 1260
<br /> 2554.509 GUIDE POST TYPE g EACH 37,00 5.00 185.00 0.00 0,00 004 1260
<br />
<br />i 554.509 GUIDE POST TYPE 8 EACH 37.00 4.00 148.00 0.00 0.00 006 1260
<br />
<br /> 2557. 603 WOODEN FENCE M 36 . 50 278 . 00 10, 147 . 00 0.00 0. O0001 1270
<br />I Totals for Proposal Line Number 1270 278.00 $10, 147.00 0.00 $0.00
<br /> 2557. 603 BARBED WIRE FENCE M 16.50 220.00 3,630.00 248.00 4, 092.00 001 1280
<br />
<br />I Totals for Proposal Line Number 1280 220..00 $3,630.00 248.00 $4,092.00
<br />
<br /> LOW S.P. NLrMBER 199-010-03 FOR WORK COMPLETED AS OF 09/26/2000 Contract Number: Z00516
<br />
<br />
<br />
|