My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/28/2008
Ramsey
>
Public
>
Agendas
>
Council
>
2008
>
Agenda - Council - 10/28/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 9:37:00 AM
Creation date
10/24/2008 2:10:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/28/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />edesign on TH 10 for westbound traffic will include a westbound to northbound right turn lane <br />'. proximately 800 feet in length, a westbound to so~thbound leftturnlane of approximately 600 feet. <br />and twO through lanes. <br /> <br />The design for TB: 10 eastbound will include an eastbound to southbound right turn lane approximately <br />300 feet in length, an eastbound to northbound left turn lane of approximately 800 feet in length and <br />two through lanes. . . . <br /> <br /> <br />The City will be responsible for the co~t of lengthening all turn lanes on TH)O, except where a bus <br />lane is constructed which will also serve as the right turn lane. The State will incorporate the <br />leng~hening of the turn lanes as indicated above in their resurfacing of TH 10 scheduled for the <br />summer of 2005 (May 27, 2005 letting). .. . <br /> <br />The City will compensate the County for all normal an.d customary fees arid .costs for all plan review <br />and permits for construction on the County Highway System. .... .. .' .. .' <br /> <br />The lengths of all turn lanes indicated above' are the lengths of the full width turn lane and tapers into <br />these turn lanes at a rate not to exceed 15 tal (180' taperJength) will beirt addition ~o.the lengths <br />shown above. . . . . '. . .' . . . <br /> <br />. . '. . <br />, . . .: . , <br />. The City will be responsible for the acquisition of additional right of way on this project. <br /> <br />.: '.~' <br /> <br />The County will arrange a meeting between the BNSF Railroad, the Minne.sota Departmen~ of <br />Transportation, the City and the County to discus~ the improvel1lentsof the.:iailroad crossing at <br />Armstrong Boulevard and theBNSF Railroad..' . ..' '.. .... <br /> <br /> <br /> <br />.(' <br /> <br />Du:qng the summer 0(2.004 itis expected that the City. wil,limproveSunwoodDrive'bet\':veen ~~sey" <br />Boulevard and Armstrong Boulevard. .It is the intention of this agreemeiltthat the' city Will : add , '.,... <br />additional temporary bituminous on the east side,' of Aflpstrong Boulevardtb 'allow the'strlping"of' . . <br />northbound and southbound left turn lanes on Armstrong Boulev~d so that 'the north and south <br />-through lanes serve as a through lane/right turn laIle)<> Sunwood Drivebotheast and west of <br />Armstrong Boulevard.' ':..,'" .............::.".. '.'" " . ' .' <br /> <br />. . . . ..' , '" <br />In addition, the City will phi.ce Type 3 barricades arid temporary striPIng along Sunwood Drive so. that <br />there are two lanes ofapproachto.Annstrbng Boulevard from the east andthe west and will provide a <br />stop condition for traffic at Sunwood Drive on both sides of ,Armstrong Boulevard. Traffic on,. <br />Armstrong Boulevard will not have a stop condition attheintersection of Sunwood Drive. <br />. ' ..;.' ',", ... - ~ <br /> <br />. . <br />It is also the intention of the'County to provide funding for the County_share of the reconstruction, of <br />Armstrong Boulevard in the summer of 2005. The City will prepare plans and'specifications for the <br />construction of Armstrong Boulevard from250 feet south ofTH 10 to 1,000 feet north of Bunker Lake <br />. Boulevard and provide those plans to the County and MnlDOTfor review and comment, and make all..' <br />necessary and requested changes in those plans prior to their accepting bids for the construction or' th~.;:; <br />work. .. .' . . <br /> <br />," "., <br />".:' ", <br /> <br />-166-. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.