Laserfiche WebLink
<br />..... MAINTAIN PROPRlETARY CONFIDENTIALITY <br /> <br />BNSFRMLWAYCOMPANY <br />FHPM ESTIMATE FOR <br />CITY OF RAMSEY <br /> <br />LOCATION RAMSEY <br /> <br />DETAILS OF ESTIMATE <br /> <br />PLAN ITEM: 000125786 <br /> <br />VERSION: 1 <br /> <br />PURPOSE, JUSTIFICATION AND DESCRIPTION <br /> <br />REVISED TO NEW PRICING LIST 03/01105 (THERE WAS NO APPROVED MATERIAL LIST AT THIS TIME.) <br /> <br />2009 PX INSTALL CONSTANT WARNING, (2) CANTILEVER/GATE COMBO'S AND (3) FLASHERS WITH GATES AT COUNTY ROAD 83 IN <br />RAMSEY, MN. TWIN CITIES DIV., STAPLES SUBDIV., US 0025, M.P. 31.79, DOT # 082932W <br /> <br />MONTHLY POWER UTILITY COST CENTER: 61740 <br /> <br />THE MATERIAL LIST BELOW REFLECTS TYPICAL REPRESENTlVE PACKAGES USED FOR ESTIMATING PURPOSE ONLY. <br />THEY CAN BE EXPECTED TO CHANGE AFTER THE ENGINEERING PROCESS, DETAILED AND ACCURATE MATERIAL LISTS WILL BE <br />FURNISHED WHEN ENGINEERING IS COMPLETED. <br />CONTINUING CONTRACTS HAVE BEEN ESTABLISHED FOR PORTIONS OF SIGNAL WORK ON THE BNSF RAILROAD. <br />THIS ESTIMATE GOOD FOR 90 DAYS. THEREAFTER THE ESTIMATE IS SUBJECT TO CHANGE IN COST FOR MATERIAL, LABOR, AND <br />OVERHEADS. <br /> <br />***********...*******U******** SIGNAL WORK ONLY ***********....****************"". <br /> <br />THE CITY OF RAMSEY IS FUNDING TIDS PROJECT 100%. <br /> <br />MAINTAIN PROPRIETARY CONFIDENTIALITY <br /> <br />DESCRIPTION <br /> <br />QUANTITY UIM <br /> <br />COST <br /> <br />TOTAL $ <br /> <br />********** <br /> <br />LABOR <br /> <br />********** <br /> <br />ELECTRICAL LABOR F/POWER TRANS SYS <br />SIGNAL FIELD LABOR - CAP <br />SIGNAL SHOP LABOR - CAP <br />PAYROLL ASSOCIATED COSTS <br />EQUIPMENT EXPENSES <br />DA LABOR OVERHEADS <br />INSURANCE EXPENSES <br /> <br />54.0 MH <br />1600.0 MH <br />96.0 MH <br /> <br />1,360 <br />38,564 <br />2,339 <br />29,076 <br />10,987 <br />45,220, <br />6,761 <br /> <br />TOTAL LABOR COST <br /> <br />134,307 <br /> <br />134,307 <br /> <br />************* <br /> <br />MATERIAL <br /> <br />************* <br /> <br />BATTERY <br />BATTERY CHOKE <br />BUNGALOW 8XI0 <br />BUNGALOW MATERIAL <br />CABLE <br />CANTILEVER/GATE COMBO <br />CHARGERS <br />CONSTANT WARNING <br />ELECTRICAL MTRL <br />FIELD MATERIAL <br />FOUNDATION <br />GATE DOWN LOGIC <br />GATEMECH <br />I-LOD <br />INFLATIONARY RATE <br />LED GATE KIT <br />LED LIGHT ADJUSTMENT <br />PRE-EMPT MATERIAL <br />RECORDER <br />SHUNT <br />SHUNT, WIDEBAND, DUAL <br />TELLULAR MONITOR <br />MATERIAL HANDLING <br />USE TAX <br />OFFLINE TRANSPORTATION <br /> <br />1.0 EA N <br />6.0 EA N <br />1.0 EA N <br />1.0 LS N <br />1.0 EA N <br />2.0 EA N <br />1.0 LS N <br />1.0 EA N <br />1.0 EA <br />1.0 LS N <br />3.0 EAN <br />1.0 LS N <br />3.0 EA N <br />2.0 EA N <br />1.0 EA N <br />5.0EA N <br />20.0 EA N <br />1.0 LS N <br />1.0 EA N <br />4.0 EA N <br />8.0 EA N <br />1.0 EA N <br /> <br />9,065 <br />1,380 <br />11,426 <br />13,125 <br />6,630 <br />57,874 <br />1,464 <br />18,620 <br />1,500 <br />11,230 <br />1,455 <br />3,500 <br />21,729 <br />846 <br />13,556 <br />1,825 <br />4,480 <br />1,250 <br />2,220 <br />3,392 <br />1,840 <br />2,500 <br />75 <br />14,840 <br />2,393 <br /> <br />TOTAL MATERIAL COST <br /> <br />208,215 <br /> <br />208,215 <br /> <br />********** <br /> <br />OTHER <br /> <br />****'1""**** <br /> <br />AC SERVICE <br />CONCRETEIFOUNDATION CANT. <br /> <br />1.0 EA N <br />1.0 LS N <br /> <br />2,000 <br />2,000 <br /> <br />-180- <br /> <br />(y1t7J5Jr i3 <br />(1l..,I\.\AL OtJLM ~l'Io.;:f <br />