Laserfiche WebLink
<br />CONTRACTENGR. <br />FILL DIRT <br />SURFACE ROCK <br /> <br />1.0 EA N <br />40.0 CYN <br />6.0 CY N <br /> <br />TOTAL OTHER ITEMS COST <br /> <br />PROJECT SUBTOTAL <br />CONTINGENCIES <br />BILL PREPARATION FEE <br /> <br />) <br /> <br />GROSS PROJECT COST <br />LESS COST PAID BY BNSF <br /> <br />TOTAL BILLABLE COST <br /> <br />6,000 <br />1,000 <br />150 <br /> <br />11,150 <br /> <br />11,150 <br /> <br />353,672 <br />35,367 <br />1,946 <br /> <br />390,985 <br />o <br /> <br />390,985 <br /> <br />r;'f..,/11 J?;j T ,b <br />SIb NA '- i),tJ I/'j <br /> <br />-181- <br />