My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/10/2008
Ramsey
>
Public
>
Agendas
>
Council
>
2008
>
Agenda - Council - 11/10/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 9:37:45 AM
Creation date
11/7/2008 12:58:04 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/10/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # <br />PUBLIC FLARING ON I.M PROVEX NT PROJECT #08 <br />BITUNTINOUS LAVING OF CHAMELEON STREET IN THE <br />Slai;A4yN ACRE S SUBDIVISION <br />By: Steven ,1,1ankowski, City Engineer <br />Background <br />A petition was received by 10 of the 20 property owners having frontage on Chameleon Street on <br />May 20, 2008 for the bituminous paving; of this street located between 173 Ave (former CR 63 <br />and 176' Lane in the Shawn Acres subdivision). A 28 foot wide bituminous pavement would be <br />constructed in the center of the 66 .foot right of way. The pavement section will consist of Four <br />inches of class 5 granular base, two inches of bituminous base course, and 1.5 inches of <br />bituminous wear course. This project will also grade ditches alongside the roadway and cause the <br />pavement runoff to discharge into the drainage and utility easements originally dedicated on the <br />plat of this subdivision, Attached to this c is a copy of the f easibility study which con <br />current and proposed conditions of the ,street along with the project costs and the anticipated <br />method of financing the improvements, This evening's public hearing will gather input and <br />c ornmenk on the project and the deWils of the feasibility study which has been mailed to each <br />property owner along with notice of this hearing <br />Following the public hearing, the Council should direct any revisions to the feasibility study it <br />deems accessary as a result of the comments matte at the public hearing, as tho feasibility study <br />will serve as the basis for determining the work to be per;farmed and the method in which costs <br />will be .financed, assuming no petitions are received f otn a majority of the benefited propGrtics <br />opposing the improvement, the Council will be asked to order the projects at its January 13, 2009 <br />meeting. 'It is anticipated that contracts will be awarded in June of 2009 and work will be <br />performed during July through August. Final costs will be presented at the assessment hearing <br />on September 28, 2009, <br />Financing; <br />A portion of the project :is anticipated to be financed through special assessments to adjacent <br />properties and notice has been sent to all bcnetited property owners as required by City Code and <br />Minnesota Statues Chapter 429, The total cost or the project is esti.rnatcd to be $339,638 with <br />$1 $0,957 from the City general Wnd; $37,724 from the storm water utility; and $ 150,957 from <br />assessrmcnts. <br />Council Action: <br />None required, unloss modillcations to the feasibility study are desired, <br />Reviewed by: r L <br />City Administrator <br />Assistant Public Works Director /Principal City Engineer <br />Finance Officer <br />CC: 11/10/08 <br />.125— <br />
The URL can be used to link to this page
Your browser does not support the video tag.