Laserfiche WebLink
ITEM <br />NO. <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT UNIT <br />• PRICE <br />CONTRACT AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />1- <br />REMOVE CONCRETE CURB <br />119 <br />LIN FT <br />$1.50 <br />$ 178.50 <br />110 <br />$ 165.00 <br />2 <br />REMOVE BITUMINOUS PAVEMENT <br />6,931 <br />SQ FT <br />$0.10 <br />$ 693.10 <br />6,200 <br />$ 620.00 <br />3 <br />SAWING CONCRETE PAVEMENT (FULL DEPTI• <br />9 <br />LIN FT <br />$3.00 <br />$ 27.00 <br />524.07 <br />$ - <br />4 <br />SAWING BITUMINOUS PAVEMENT (FULL DEP1 <br />228 <br />LIN FT <br />$2.00 <br />$ 456.00 <br />337 <br />$ 674.00 <br />5 <br />RELOCATE COMMERCIAL SIGN <br />1 <br />EACH <br />$400.00 <br />$ 400.00 <br />115,68 <br />$ - <br />8 <br />COMMON EXCAVATION (P) <br />3,001 <br />CU YD <br />$4.00 <br />$ 12,004.00 <br />3,001 <br />$ 12,004,00 <br />7 <br />TOPSOIL BORROW, LV <br />393 <br />CU YD <br />$15,05 <br />$ 5,914.85 <br />104,84 <br />$ <br />8 <br />AGGREGATE BASE CLASS 5 MODIFIED <br />1,238 <br />TON <br />$18.16 <br />$ 18,755.70 <br />1,214 <br />$ 18,392,10 <br />9 <br />MILL BITUMINOUS SURFACE (1.51 <br />78 <br />SQ YD <br />$16,25 <br />$ 1,267,50 <br />78 <br />$ 1,267.50 <br />10 <br />TYPE MV 3 WEARING COURSE MIXTURE (B) <br />353 <br />TON <br />$77.81 <br />$ 27,466.93 <br />312.11 <br />$ 24,285.28 <br />11 <br />TYPE MV 3 NON WEARING COURSE MIXTURE <br />529 <br />TON <br />$73,71 <br />$ 38;992,59 <br />571.03 <br />$ 42 090462 <br />12 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />140 <br />GALLON <br />$1,50 <br />$ 210.00 <br />208 <br />$ 312,00 <br />... <br />13 <br />CONCRETE FLUME <br />1 <br />EACH <br />$600.00 <br />$ 600.00 <br />$ - <br />14 <br />MODULAR BLOCK RETAINING WALL <br />360 <br />SO FT <br />$18.50 <br />$ 6,476.00 <br />328 <br />$ 6,068.00 <br />15 <br />12" RC PIPE SEWER DESIGN 3006, CL V <br />77 <br />LIN FT <br />$20.00 <br />$ 1,540.00 <br />74 <br />8 .1,480.00 <br />16 <br />15" RC PIPE SEWER DESIGN 3006, CL V <br />904 <br />LIN FT <br />$20.70 <br />$ 18,712.80 <br />880 <br />$ 18,216,00 <br />97 <br />CONNECT INTO EXISTING DRAINAGE STRUM <br />1 <br />EACH <br />$400.00 <br />$ 400,00 <br />1 <br />$ 400,00 <br />18 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN <br />8 <br />EACH <br />$1,308.00 <br />$ 7,836.00 <br />6 <br />$ 7,838.00 <br />19 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN <br />3 <br />EACH <br />$841.00 <br />$ 2,523,00 <br />3 <br />$ 2,523.00 <br />20 <br />CASTING ASSEMBLY <br />9 <br />EACH <br />$454.00 <br />$ 4,086.00 <br />9 <br />$ 4,086.00 <br />21 <br />RANDOM RIPRAP CLASS III <br />14 <br />CU YD <br />$60.00 <br />$ 840.00 <br />$ - <br />P2 <br />CONCRETE CURB & GUTTER DESIGN 8618 <br />1,74.0 <br />LIN FT <br />$10.26 <br />$ 17,852.40 <br />1,723 <br />$ 17,677.98 <br />23 <br />7" CONCRETE DRIVEWAY PAVEMENT <br />64 <br />SQ YD <br />$45.00 <br />$ 2,880.00 <br />31 <br />$ 1,395.00 <br />24 <br />INSTALL 4" PVC (SCH 40) CONDUIT <br />100 <br />LIN FT <br />$4.00 <br />$ 400.00 <br />100 <br />$ 400.00 <br />25 <br />CONIFEROUS TREE 6' HT B&B <br />5 <br />TREE <br />$300.00 <br />$ 1,500.00 <br />$ - <br />28 <br />SILT FENCE, TYPE MACHINE SLICED <br />1,650 <br />LIN FT <br />$1.65 <br />$ 2,722.50 <br />250 <br />$ 412.50 <br />27 <br />STORM DRAIN INLET PROTECTION <br />9 <br />EACH <br />$50.00 <br />$ 450,00 <br />9 <br />$ 450,00 <br />28 <br />TEMPORARY ROCK CONSTRUCTION ENTRAN <br />1 <br />EACH <br />$800.00 <br />$ 800.00 <br />$ - <br />29 <br />SODDING LAWN TYPE <br />170 <br />SQ YD <br />$4.00 <br />$ 680.00 <br />143 <br />$ 572.00 <br />30 <br />TURF ESTABLISHMENT <br />1,1 <br />ACRE <br />$800.00 <br />$ 880,00 <br />1.1 <br />$ 880,00 <br />31 <br />B -612 CURB' <br />130.0 <br />LIN FT <br />$20,00 <br />$ 2,800,00 <br />130 <br />$ 2,600.00 <br />mu 0Cneuuns <br />ITEM <br />NO, <br />--o • 'urn Lan" V VnaN4Y4Yn <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT UNIT <br />PRICE <br />CONTRACT AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />1 <br />REMOVE BITUMINOUS PAVEMENT <br />8,382 <br />SQ FT <br />$0.15 <br />$ 967.30 <br />5,500 <br />$ 825.00 <br />2 <br />SAWING BITUMINOUS PAVEMENT (FULL DEP1 <br />790 <br />LIN FT <br />$2.00 <br />$ 1,580.00 <br />500 <br />$ 1,000.00 <br />3 <br />AGGREGATE BASE CLASS 5 <br />546 <br />TON <br />$15.42 <br />$ 8,419.32 <br />524.07 <br />$ 8,081.16 <br />4 <br />MILL BITUMINOUS SURFACE (1.5 ") <br />177 <br />SQ YD <br />$6.14 <br />$ 1,086.78 <br />140 <br />$ 859.60 <br />5 <br />TYPE MV 3 WEARING COURSE MIXTURE (B) <br />133 <br />TON <br />$79.94 <br />$ 10,632.02 <br />115,68 <br />$ 9247.46 <br />6 <br />TYPE MV 3 NON WEARING COURSE MIXTURE <br />120 <br />TON <br />$78.35 <br />$ 9,402.00 <br />107.32 <br />$ 8,408.52 <br />7 <br />TYPE LV 3 NON WEARING COURSE MIXTURE <br />166 <br />TON <br />$75,44 <br />$ 12,523.04 <br />104,84 <br />$ 7,909.13 <br />8 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />64 <br />GALLON <br />$1.79 <br />$ 114.56 <br />64 <br />$ 114.56 <br />g <br />TURF ESTABLISHMENT <br />0.3 <br />ACRE <br />$1,500.00 <br />$ 450.00 <br />0.3 <br />$ 450.00 <br />10 <br />4" SOLID LINE WHITE • EPDXY <br />960 <br />LIN FT <br />$2.00 <br />$ 1,920.00 <br />$ <br />November 7, 2008 <br />"A" St t C n tructlon <br />• <br />PAY ESTIMATE #1 <br />CITY OF RAMSEY <br />144th Avenue NW Utility and Street Improvements <br />. City of Ramsey Project No. 08.36 <br />Honorable Mayor & City Council <br />City of Ramsey <br />7550 Sunwood Drive <br />Ramsey, MN 55303 <br />RE: 144th Avenue NW Utility and Street Improvements <br />Contractor: Erin Contracting <br />Contract Amount: $262,278.74 <br />Award Date: August 27, 2008 <br />Completion Date: June 1, 2009 <br />Dear Honorable Mayor and Council Members: <br />The following work has been completed on the above - referenced project by Erin Contracting. <br />Total Bld Schedule "A" <br />$ 180,143.87 <br />184,808,9 <br />FIELD CHANGE <br />S: \MunIcipal\Aramsey 13182 \Specification\ra3182pe <br />Total Bid Schedule "B" <br />PE - 1 <br />47,085.02 <br />38, 896.43 <br />ENGINEER <br />-117- <br />