My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/25/2008
Ramsey
>
Public
>
Agendas
>
Council
>
2008
>
Agenda - Council - 11/25/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 9:38:33 AM
Creation date
11/21/2008 9:48:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/25/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"0" Sewer and Watermein Construction <br />"C" • Pond Grading and Turf Establishment <br />ITEM DESCRIPTION <br />Bld Schedule <br />ITEM <br />NO. <br />• <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT UNIT <br />PRICE <br />CONTRACT AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />$ 576.00 <br />391 <br />6" SDR 26 PVC PIPE (12'•14') <br />36 <br />LIN FT <br />516,00 <br />$ 678.00 <br />36 <br />1 <br />6" DUCTILE IRON PIPE CLASS 53 <br />12 <br />LIN FT <br />$24.00 <br />$ 288.00 <br />12 <br />$ 288.00 <br />2 <br />8" DUCTILE IRON PIPE CLASS 52 <br />665 <br />LIN FT <br />$27.80 <br />$ 18,487.00 <br />640 <br />$ 17,792.00 <br />3 <br />6" PVC CAP <br />1 <br />EACH <br />$5.00 <br />$ 5.00 <br />1 <br />$ 5.00 <br />4 <br />DUCTILE IRON FITTINGS <br />505 <br />POUND <br />$0.01 <br />$ • 5.05 <br />450 <br />$ 4.50 <br />5 <br />CONNECT TO EXISTING WATERMAIN <br />2 <br />EACH <br />$400.00 <br />$ 800.00 <br />2 <br />$ 800.00 <br />6 <br />HYDRANT <br />1 <br />EACH <br />$2,985.00 <br />$ 2,985.00 <br />1 <br />$ 2,985.00 <br />7 <br />6" GATE VALVE AND BOX <br />1 <br />EACH <br />$961.00 <br />$ _ 961.00 <br />. 1 <br />$ 961.00 <br />8 <br />8" GATE VALVE AND BOX <br />1 <br />EACH <br />$2,085.00 <br />$ 2,085.00 <br />1 <br />$ 2,085.00 <br />g <br />CONNECT TO EXISTING SANITARY SEWER <br />1 <br />EACH <br />$510,00 <br />$ 510.00 <br />1 <br />$ 510.00 <br />10 <br />ADJUST SANITARY MANHOLE <br />2 <br />EACH <br />$300,00 <br />$ 600.00 <br />2 <br />$ 800,00 <br />11 <br />__ . M RtI9 0A S 28.608.50 <br />Bid Schedule <br />ITEM <br />"C" • Pond Grading and Turf Establishment <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT UNIT <br />PRICE <br />CONTRACT AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />NO. <br />COMMON EXCAVATION (P) <br />391 <br />CU YD <br />$4.00 <br />$ 1,564.00 <br />391 <br />$ 1 584,00 <br />TURF ESTABLISHMENT <br />0,4 <br />ACRE <br />$1,500.00 <br />$ 600,00 <br />0.4 <br />$ 800.00 <br />2 <br />.__ .. .. _ .. ,n. nn ! 2.184.00 <br />Bld Schedule "6" • Mobilization and Traffic Control <br />Bid Schedule "A" - Street Construction <br />Bid Schedule "B" - Turn Lane Construction <br />Bid Schedule "C" - Pond Grading and Turf Establishment <br />Bid Schedule "D" - Sewer and Watermain Construction <br />Bid Schedule "E" - Mobilization and Traffic Control <br />TOTAL <br />Total Work Completed to Date <br />LESS 5% RETAINAGE: <br />WE RECOMMEND PAYMENT OF: <br />Signe <br />Title: <br />OWNER: CJTY OF RA <br />Signed: <br />Title: DP? <br />S: \Municipal Aramaey \3182 \Specification \re <br />-118- <br />PAY ESTIMATE #1 <br />CITY OF RAMSEY <br />144th Avenue NW Utility and Street Improvements <br />City. of Ramsey Project No. 08 -36 <br />Total Bld Schedule "C' <br />otal Bid S che d u l e <br />$ <br />6 882.00 <br />1 500.00 <br />1.0 <br />1.0 <br />ITEM <br />NO. <br />MOBILIZATION <br />TRAFFIC CONTROL <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />CONTRACT UNI <br />PRICE <br />CONTRACT AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />8 682.00 <br />$ <br />1 500,00 <br />UNIT <br />Total Bld Schedule "E" <br />APPROVALS: <br />CONTRACTOR: • TRACTING <br />Certi tion by Contractor: certify all ' ms a ^ amounts are correct for the work completed to date. <br />Date /A1 <br />ENGINEER: HAKANSON ANDERSON ASSOCIATES, INC. <br />Certification by Engineer: We recommend payment for work and quantities as shown. <br />PE - 2 <br />Date ////e <br />8,182.00 <br />8,182.00 <br />$ 180,143.67 $ 164,806.98 <br />$ 47,085.02 $ 36,895.43 <br />$ 2,164.00 $ 2,164.00 <br />$ 27,302.05 $ 26,606.50 <br />$ 8,182.00 $ 8,182.00 <br />$ 238,654.91 <br />$ 238,654.91 <br />$ 11,932.75 <br />$ 226,722.16 <br />ENGINEER <br />
The URL can be used to link to this page
Your browser does not support the video tag.