Laserfiche WebLink
Table VI -2 Existing and .i uture i rattle v ululu CS <br />Location of Count <br />Existing <br />Count <br />2020 <br />Count <br />with <br />future <br />Bridge <br />2020 Count <br />without future <br />Bridges <br />Cty 83 s/o Cty 22 <br />4,200 <br />10,000 <br />( 10 <br />Cty 83 n/o 153 <br />4,800 <br />17,400 <br />..,%8 700° <br />Cty 63 w/o Cty 5. <br />1,000 <br />5,200 <br />_ 3 ,"` <br />Cty 63 e/o Cty 5 <br />2,000 <br />10,100. <br />- <br />_- ,600 <br />Cty 27 e/o TH 47 <br />1,900 <br />3,8(1 <br />= 3,800 <br />TH 47 n/o Cty 27 <br />6,900 <br />- 15,100 <br />--- <br />.0 <br />TH 47 n/o Cty 5 <br />14,80 <br />14,00 ; <br />14,800 <br />TH 47 n/o Cty 116 <br />22,200 <br />- <br />22 PD0 <br />23,500 <br />Cty 5 n/o 167 <br />_ 5,900_ <br />x,100 <br />10,900 <br />Cty 5 e/o Cty 5 <br />ty ty <br />_ =0 <br />3 <br />12,000 <br />12,100 <br />Cty 5 s/o 153 <br />= 5,2 <br />11,600 <br />12,400 <br />15,200 <br />16,300 <br />Cty 56 n/o 149 <br />0 <br />Cty 56 Sunwoos - <br />= 6,400 <br />23,400 <br />18,500 <br />n/o <br />Cty 57 n/o53`d _ <br />1,900 <br />4 <br />4,600 <br />Cty 57 n/o U - = <br />9,100 <br />18,700 <br />22,200 <br />c <br />Cty 116 eT&.Cty 5V <br />2,900 <br />22,900 <br />22,100 <br />Cty MtkLEty 57 <br />8,100 <br />24,600 <br />23,600 <br />36,000 <br />43,200 <br />44,800 <br />w/o Cty 83 <br />US 10o Cty 83 <br />39,000 <br />40,400 <br />47,700 <br />NA <br />23,700 <br />NA <br />FuTe Bridge* <br />The resultant 2030 average annual daily traffic forecasts (AADT) developed for principal <br />arterials, minor arterials, and collectors in Ramsey are shown in Table VI -2. <br />2008 Comprehensive Plan <br />* Traffic forecasts for bridge crossing are based on Anoka County's preferred bridge <br />alignment <br />Source: Anoka County 2030 Transportation plan model adjusted to account for updated city <br />land uses by Iteris, Inc. <br />4. Adequacy of Roadway System in Year 2030 <br />To determine whether the arterials of the 2030 roadway system will adequately <br />accommodate the traffic volumes forecast for 2030, a comparison between the <br />forecast AADT and the capacity provided by each facility has been made. The daily <br />capacity calculations were generated by applying Mn/DOT recorded 2007 traffic <br />volumes and 2030 modeled traffic volumes to roadway thresholds generally accepted <br />2008 Ramsey Comprehensive Plan Page VI -15 <br />