Laserfiche WebLink
<br />Subsection 9.50.50 (Construction ofhnprovements) Subd. 3 (Stage I Improvements) <br /> <br />(l') separation between the. edge of one side and the residential propertY <br />line. The sidewalk. shall be constructed as a Stage 1 improvement. Cost of <br />. sidewalk construction shall be borne by the Subdivider and not eligible for <br />credit against park and trail dedication fees. The design must meet current <br />standards of the City, comply with the Americans for Disabilities ACT <br />(ADA),. and be shown on the preliminary plat for approval. All sidewalks <br />required by the City shall be constructed of a four-inch concrete placed on <br />a four inch (4") gravel base. . <br /> <br />1. Maintenance - The City Council annually shall determine the level of <br />snow removal.required of adjacent homeowners and to provide for the <br />establishment of a fund to allow for repair or replacement of damaged <br />sidewalks in the future. <br /> <br />k. Electricity. The Subdivider shall be responsible for providing electric <br />service to the Plat. Whenever possible, common trenching shall be utilized <br />for small utilities (cable, gas, electric, telephone). <br /> <br />l. Phone. The Subdivider shall be responsible for providing phone service to <br />the Plat. Whenever possible, common trenching shall be utilized for small <br />utilities (cable, gas, electric, telephone). <br /> <br />ID. Natural Gas. The Subdivider shall be responsible for providing natural <br />gas service to the plat. Whenever possible, common trenching shall be <br />utilized for small utilities (cable, gas, electric, telephone). . <br /> <br />n. Boulevard Sodding. This item shall be completed just prior to occupancy <br />of the building. This item may be completed sooner provided the subdivider <br />maintains the sod until the dwelling or structure is occupied. .Boulevard sod <br />shall be installed over at least four (4) inches of topsoil. as defined in <br />Section 9.02; <br /> <br />o. Water Shut-Off Boxes. The water shut-off boxes shall be adjusted at the <br />time the final boulevard grade is established. Water shut-off boxes shall <br />remain visible after the boulevard sod is installed. <br /> <br />p. . Easement Acquisition. . Prior to the time of construction, the owner or <br />subdivider shall obtain all easements required for the project. At the time <br />the project is complete and turned over to the City, all easements not <br />dedicated on the final plat shall be deeded to the City in a separate <br />recordable document. <br /> <br />q.. . As~built Plans. Upon completion of installation of all required <br />improvements, the subdivider shall file with the. City copies of plans and <br />. specifications showing all improvements as finally con.structed and installed . <br />in both digital and paper form as required by the City Engineer. Such as- <br /> <br />56 <br />