My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 09/16/2008
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2000 - 2009
>
2008
>
Minutes - Public Works Committee - 09/16/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:36:24 PM
Creation date
12/8/2008 2:19:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
09/16/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City Administrator Ulrich arrived at the meeting. <br /> <br />John Ewert, 5414 151 st Avenue, stated that he is concerned about closing 152nd because that will <br />increase traffic through the neighborhood and there would only be one outlet on 149th. He stated <br />that a while back there was an accident at the intersection that blocked the whole road. <br /> <br />Chairperson Elvig stated that this is the perfect point about why there should always be 2 access <br />points in and out of a neighborhood. <br /> <br />Fire Chief Kapler stated that the City has been pretty aggressive, when there has been an <br />opportunity, to get rid of single access neighborhoods. He stated that he understands that these <br />sometimes meet with resistance, but from a public safety standpoint, neighborhoods are much <br />safer with additional access points. <br /> <br />City Engineer Jankowski stated that if the staff recommendations move forward, there will be 3 <br />access points in and out of this neighborhood. <br /> <br />Chairperson Elvig suggested that the Public Works Commission move each hem separately. <br /> <br />Motion by Councilmember Olson, seconded by Chairperson Elvig, to move IP 08-31 Chameleon <br />Street project forward and affirm the proposed full unit assessment for vacant property; and <br />direct staff to review the grades at 17410 Chameleon to determine whether the planned drainage <br />improvements should be modified. <br /> <br />Motion carried. Voting Yes: Chairperson Elvig and Councilmembers Olson and Dehen. Voting <br />No: None. <br /> <br />City Engineer Jankowski reviewed the staff recommendations for the 151 st Avenue, 152nd <br />Avenue and Fluorine Street project. <br /> <br />Motion by Councilmember Olson, seconded by Councilmember Dehen, to move IP 08-34 151st <br />Ave, 152nd Avenue and Flourine Street project forward and direct staff to: remove the closure of <br />152nd Avenue at TH 47 from the scope of the improvements; affirm the retention of the <br />connection of 152nd Avenue to Helium Street within the scope of the improvements; and affirm <br />proposed equal assessment for comer properties on the frontage road. <br /> <br />Further Discussion: Chairperson Elvig stated that he would also like make sure that staff takes a <br />look at costs for cuI de sacs versus connecting the road to Helium Street. <br /> <br />Motion carried. Voting Yes: Chairperson Elvig and Councilmembers Olson and Dehen. Voting <br />No: None. <br /> <br />City Engineer Jankowski stated that project 08-33 Ute Street, had an informational meeting last <br />week and the proposed right of way was a significant concern from the residents in attendance. <br />He stated that it appears that the right of way that exists is not in a straight line, so the City needs <br />to do additional research on where the actual property lines are located. He stated that there may <br /> <br />Public Works Committee / September 16,2008 <br />Page 5 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.