Laserfiche WebLink
<br />· The above figures account for the purchase of the properties that currently are developed with a <br />business. These figures do not include the purchase of the vacant/raw land that would be <br />associated with the interchanges extending outside of the currently projected right-of-way. <br /> <br />· These figures assume that the right-of-way is purchased as shown. If the right-of-way is <br />adjusted either way, these numbers would change. <br /> <br />· The relocation of the businesses would depend upon the type of business. For, instance if the <br />project required relocation of the propane business, estimated costs are $20,000 to $50,000, <br />depending on the reusability of the storage tank. This business would not be displaced by the <br />locating of the proposed interchange as shown on the attached map. The car lots and farm <br />center relocation costs would be based upon the moving of the cars and other inventory but <br />should not exceed $15,000 per business (Bud Storm, Evergreen Land Services, 566-1036). <br />To have a preliminary estimate done would cost $100-$200. <br /> <br />· Property values are from County tax records and may vary from market conditions. No <br />figures are shown for any acquisition expense such as legal or appraisal fees.. <br /> <br />· It should be noted that both the Planning Commission and Economic Development <br />Commission have recommended the area between Ramsey Boulevard N.W. and Armstrong <br />Boulevard N.W., along the north side of Highway #10, as green space. In this green space, <br />there are currently nine businesses with an estimated market value of $1,179,100. To impact <br />all of these businesses, a project including up to 2,500 feet on either side of the existing right- <br />of-way of the eastern alignment would be required. <br /> <br />· While the westerly alignment shows the corridor over an existing business, acquisition of this <br />property (beyond land) was not suggested (except for the interchange example shown above). <br />The rationale is that the alignment could be shifted east or west to avoid purchase of the <br />property. A similar circumstance likely could result for the eastern alignment regarding <br />business acquisition. <br /> <br />· Right-of-way for bridge alignment was estimated to be 200 feet wide. <br />· Right-of-way for County Road #116 was estimated to be 150 feet wide. <br /> <br />Based upon the above, the criteria we considered was property acquisition and roadway (not river <br />bridge) construction (including highway/railroad bridging). For this analysis, we did not provide <br />any breakdown regarding transportation impact on neighborhoods or assumed drive miles from <br />any point to any other point. While there has been significant discussion on marketability of <br />adjacent land, this also was not reviewed within this analysis. Pursuant to the above: <br /> <br />North/south right-of-way acquisition <br />C.R. #116 acquisition to Ramsey/Armstrong Blvd N.W. <br />North/south roadway construction <br />Highway #10IB.N. bridge construction <br />County Road #116 roadway construction <br />Possible approach acquisition <br />Estimated approach relocation <br />TOT AL COST <br /> <br />Westerly <br />Alignment <br />$186,200 <br />$125,300 <br />$869,022 <br />$600,000 <br />$1,176,150 <br />$131,400 <br />$15.000 <br />$3,103,072 <br /> <br />Western <br />Alignment <br />Route C <br />$299,990 <br />$125,300 <br />$1,400,100 <br />$600,000 <br />$1,176,150 <br />$74,000 <br />~ <br />$3,675,540 <br /> <br />Easterly <br />Alignment <br />$70,980 <br />$64,408 <br />$331,274 <br />$900,000 <br />$797,250 <br />$260,000 <br />$80.000 <br />$2,503,912 <br /> <br />The right of way acquisition portion of either project quite likely will be a municipal expense <br />estimated above at up to $500,000. The City should consider the source of these funds within a <br />future capital improvements programming process. <br />