My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/27/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 01/27/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 3:48:06 PM
Creation date
1/22/2009 11:54:29 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/27/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-134— <br />applicable agency. Approval of the building foundation requires a certificate of elevation <br />signed by a licensed (State of Minnesota), professional land surveyor, verifying that the <br />elevation with the approved grading plan for the Plat. Foundation approvals will require a <br />certificate of elevation verifying that the actual elevation is in compliance with the approved <br />grading and drainage plan. The lowest floor elevation shall be at least 2 feet above the 100 <br />year elevation. <br />No occupancy permit for any lot in the Plat shall be issued until all utilities are in place, <br />operational and accepted by the CITY. <br />15. Hard Surfaced Driveways. Hard surfaced driveways (bituminous or concrete) are a <br />requirement for the Plat. In the event this improvement is not timely installed on a lot, the <br />DEVELOPER and/or the DEVELOPER'S assign(s), agrees that the CITY may install said <br />improvement on the lot and specially assess the cost therefore against the lot. The <br />DEVELOPER hereby waives all right to a public hearing and other statutory rights or City <br />Charter rights granted a property owner relating to special assessments, including the right to <br />appeal the special assessment for installation of the hard surfaced driveway. In addition, the <br />DEVELOPER grants the CITY a license to enter on each lot of the Plat in order to install <br />the improvement described in this paragraph if the same has not been previously constructed. <br />16. Plat Approval Expenses. The DEVELOPER agrees that it will pay to the CITY all CITY <br />expenses incurred in the approval of the Plat, including, but not limited to administration <br />expenses, engineering and legal fees. Said expenses shall be paid within fifteen (15) days of <br />billing by the CITY and outstanding billings shall be paid prior to recording of the Final Plat. <br />Any expenses incurred after recording of the Final Plat shall also be paid within said fifteen <br />(15) day billing period. Failure to pay the CITY'S expenses within the fifteen (15) day <br />billing period will permit the CITY to draw upon any of the escrows required by this contract <br />for payment. <br />17. Reimbursement to the City. The DEVELOPER agrees to reimburse the CITY for all costs <br />incurred by the CITY in defense or enforcement of this Agreement, or any portion thereof, <br />including court costs and reasonable engineering and attorney's fees. <br />18. Marketable Title. Prior to recording of the Final Plat, the DEVELOPER shall provide the <br />CITY with proof of marketable title to the Plat either through a currently certified abstract, <br />registered property abstract or title insurance. <br />19. Certificate of Occupancy. The term Certificate of Occupancy" as used in this Agreement <br />shall be defined as a document issued by the City's Building Official, which authorizes the <br />structure to be used for its intended purposes. <br />Michels Property <br />Development Agreement <br />January 2009 <br />Page 6 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.