Laserfiche WebLink
ACCEPT PRELIMINARY DESIGN REPORT AND AUTHORIZE <br />THE PREPARATION OF PLANS AND SPECIFICATIONS FOR <br />WATER TOWER #3 AT 16600 ST. FRANCIS BOULEVARD <br />By: Tim Himmer, Assistant City Engineer <br />CASE # 5 <br />Background: <br />The City's Comprehensive Water System Study, conducted in 2004 by Bolton & Menk, <br />identified a storage deficiency in the City's water system. The report summarized that the water <br />storage needs of the City could be most economically constructed to meet future demand with a <br />combination of an elevated storage tower and a ground storage reservoir. An elevated tower in <br />the vicinity of Elmcrest Park would provide fire protection and improved static pressure to the <br />northeast quadrant of the City, and a ground reservoir at the future proposed water treatment <br />facility would provide the same for the southwest quadrant of the City. Since funding for the <br />future proposed water treatment facility and associated distribution system improvements has not <br />been determined and is likely some time out, advancement of the elevated storage tower is vital <br />to improving the overall water distribution system of the City in the short term. Constructing <br />this elevated storage tower will enhance water system reliability, and expand the existing water <br />supply system to support future growth. <br />City Council authorized the award of contract for engineering services, and the undertaking of a <br />feasibility study on April 22, 2008. During the site investigation it was found that the soils in the <br />proposed location of the tower were unsuitable for standard construction practices. The cost to <br />construct the tower in the proposed location increased by approximately $400,000, to include the <br />installation of piles to support the structure and carry the load to the underlying suitable soils. <br />Staff worked with our geotechnical consultant on alternative locations in the area that were more <br />suitable to reduce the additional cost of pilings. Three alternative locations were identified and <br />staff contacted a couple of surrounding property owners to see if they would be open to soil <br />investigation on their property, with the potential for a future acquisition to serve as the tower <br />site. Of the three locations explored only one came back with favorable results, 16600 St. <br />Francis Boulevard. <br />On October 14, 2008 staff was directed to conduct additional due diligence, to further investigate <br />the potential acquisitions, and negotiate with the property owners. Council reviewed information <br />in closed session on November 18, 2008 and authorized staff to prepare purchase agreements. <br />On December 9, 2008 Council approved the purchase agreements for the properties that will <br />serve as the location of the proposed water tower, and provide a permanent dedicated access to <br />Elmcrest Park. <br />Observations: <br />The City's consultant, Progressive Consulting Engineers, Inc., has reviewed and evaluated <br />previous engineering documents for the City's municipal water system, modeled the existing <br />system, and studied the incorporation of the new tower into this system. All this information was <br />analyzed and incorporated into the Preliminary Design Report. With the exception of site <br />—163— <br />