Laserfiche WebLink
<br />Page 90f9 <br /> <br />10.6 Compliance Documents <br />If required under previous sections oftl1is by-law, the applicant will provide with the <br />application: <br /> <br />(a) a description of financial surety that satisfies 8.3 of this section, <br />(b) proof of liability insurance that satisfies Section 3.3 of this section, <br />(c) certification of height approval from the FAA, <br />(d) a statement that satisfies Section 6.3, listing existing and maximum projected <br />noise levels from the wind facility. <br /> <br />10.7 Independent Consultants - (Utility-Scale Wind Facilities Only) <br />Upon submission of an application for a special permit, the special permit granting <br />authority will be authorized to hire outside consultants, pursuant to section 530 of chapter <br />44 ofthe Massachusetts General Laws. As necessary, the applicant may be required to pay <br />not more than 50% of the consultant's costs. <br /> <br />9 <br /> <br />-37- <br />