My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/10/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 03/10/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 3:54:33 PM
Creation date
3/5/2009 11:21:08 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/10/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
It is the City's policy to assess property owners a fixed percentage of the total project cost of the <br />improvements for projects associated with the annual street o t case oF al f <br />bituminous overlays this percentage is 50% of the, total project <br />be <br />projects the council has determined� that it desires t w pc �mm assessm <br />� ince 1 1991 l the <br />accomplished aver a seven year period beginning <br />percentage assessed for such projects has been 50% with a 100 % assessment prior to that tine, <br />until year <br />In each of the next seven years the assessment pc;rce e eliminated, This changey � r r: debt d <br />2014 when the assessment for sealco�its will be comp le1� Y <br />in the summary of assessment policies which is contained in Appendix B. For the 2009 program <br />sealcoats will be assessed 36 of the - total project cost, cul-de-sac lo ts, a wh h ar common w thin <br />of f ront footages or property size since corner lots a <br />the City, would receive widely disparate assessments, S ince r le t s o fe that generally a b classified <br />subdivisions which have similar characteristics an <br />apportionment of project costs when assessed equally within the individual subdivisions, <br />"Cable 5 contains the distribution of costs between the City and the benefited s tie s . ix listing o <br />bene properties is listed in the preliminary assessment l <br />projects will have a final tabulation <br />costs contained within this report are estimated costs, The pr described in this report. A public <br />made; on actual project costs consistent with the methodology <br />hearing will be hold id�;r�ti:f'ying the actual costs�to be recovered by special assessment, Each <br />property may, at any time prior to ctorti:Ctcation of the ,assess � interest shall t be h rged <br />whole of the assess rent on sLwh property, with interest, except <br />if the entire assessment ent is paid within 30 days from the o file ass <br />11 Ae�QdL for <br />Spe cial assessments reported to Ancal�a County shall p y <br />sealcoating projects, and over a ten -year period for bitum 4 a� overlaying tp a i intere thi� time <br />at a rate of two percent (2 %) above the U,S, Treasury <br />hearing. <br />PROJECTED PROJECT SCHEDULE <br />A schedule for the milestones associated with this project is presented in Table 6 <br />—159— <br />
The URL can be used to link to this page
Your browser does not support the video tag.