My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/10/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 03/10/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 3:54:33 PM
Creation date
3/5/2009 11:21:08 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/10/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(1) Ramsey Boulevard is improved to a four lane divided highway from T.H. 10 to <br />1,000 feet north of Bunker Lake Boulevard.. This project includes signal <br />modifications at T.H. 10 and railroad crossing upgrades (signal and surface). <br />(2) A full traffic actuated signal is installed at Ramsey Boulevard and Bunker Lake <br />Boulevard and at Ramsey Boulevard and Sunwood Drive with right and left turn <br />lanes as required for all approaches to the intersection. <br />(3) Turn lanes (both left and right) will be added on Bunker Lake Boulevard at Town <br />Center Drive. <br />(4) Left turn lane s as required for south bound traffic and a right turn lane for north <br />bound traffic will be added on Armstrong Boulevard at Sunwood Drive. <br />(5) Several city streets will be constructed south of Bunker Lake Boulevard. <br />13. I'hase Il (2006) - Phase two of the project includes the following components: <br />(1) Armstrong Boulevard is reconstructed from T.H. 10 to 1,000 feet north of <br />Bunker Lake Boulevard to a four lane divided roadway. This project includes <br />signal modifications at T.H. 10 and railroad crossing upgrades (signal and <br />surface). <br />(2) Full traffic actuated signal systems would be installed at the intersections of <br />Bunker Lake Boulevard and Armstrong Boulevard, and at Armstrong Boulevard <br />and Sunwood Drive. All signals on Lake Boulevard shall be <br />interconnected with an interconnect system compatible with other County <br />interconnects. <br />C. Phase 111 (20071 - Phase three of the project includes the following components: <br />(1) Bunker Lake Boulevard is reconstructed to a four lane divided roadway from <br />Armstrong Boulevard to 1,000 feet west of Ramsey Boulevard (C.R. 56). <br />(2) Full traffic actuated signal systems would be installed at the intersection of <br />Bunker Lake Boulevard and Town Center Drive, Bunker Lake Boulevard at <br />Sunfish Lake Boulevard. All signals on Bunker Lake Boulevard shall be <br />interconnected with an interconnect system compatible with other County <br />interconnects. <br />(3) The County will consider the addition of a full traffic actuated signal system at <br />the intersection of Bunker Lake Boulevard and Sunwood Drive following receipt <br />of additional traffic information to justify said signal system. <br />(4) The remaining City streets south of Bunker Lake Boulevard would be <br />constructed. Town Center Drive north of Bunker Lake Boulevard will be <br />R <br />�'I:C <br />
The URL can be used to link to this page
Your browser does not support the video tag.