My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/10/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 03/10/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 3:54:33 PM
Creation date
3/5/2009 11:21:08 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/10/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
constructed. The bty will insure that only six full accesses will connect to <br />Bunker Lake Boulevard between Armstrong Boulevard and Ramsey Boulevard, <br />with a four- legged intersection counting as two accesses. This provision is in <br />agreement with the original Joint Powers Agreement between the City and the <br />County at the time the roadway was constructed. <br />(5) Any modification of the signals existing on the project as a result of prior <br />construction. <br />.I >. Phase IV (2007) - Phase four of the project includes the following components: <br />Sunfish Lake Boulevard is reconstructed to a four lane divided roadway from T.H. 10 to <br />1000 feet north of Bunker Lake Blvd. (C.R. 116). This project includes signal <br />improvements at C.R. 116 and C.R. /C.S.A.H. 57 and at T.H. 10 and C.S.A.H. 57 and a <br />railroad crossing upgrade to the crossing surface and signal. The County will be the lead <br />agency on this project. <br />6. '1 IZMS <br />A 'I.'he RTC design shall provide a pedestrian bridge over U.S. Highway 10, connecting the <br />RTC development to Mississippi West Regional Park. This should be aligned with the <br />proposed trail through the treatment pond south of U.S. Highway 10. This section does <br />not prohibit the City from seeking other sources of funding to assist in construction of the <br />pedestrian bridge.. <br />li. The design of the Ramsey Boulevard and U.S. Highway 10 intersection must also <br />accommodate vehicular connection between the park and Ramsey Boulevard, south of <br />Highway 10. Ingress /egress to the park is to be constructed with turn lanes and stacking <br />from Highway 10 to the park entrance and from the park entrance to Highway 10. <br />C. The proposed settling pond, treatment pond, and infiltration ponds should be designed in <br />such a manner as to meet the following objectives: <br />(1) Grade a "bench" to accommodate a future trail with a minimum width of 10 feet, <br />plus 2 -foot shoulders; provide holding capacity to accommodate a 100 year flood <br />event without over- topping the trail; and - <br />(2) Incorporate native plant materials that are suitable to the conditions of the site <br />and provide an aesthetic park -like appeal; and <br />(3) Use an outlet structure at the Mississippi River which minimizes visual and <br />physical intrusion in the park. <br />C'l <br />-299- <br />
The URL can be used to link to this page
Your browser does not support the video tag.