Laserfiche WebLink
f <br />1 <br />13. Total estimated construction cost of the Improvements described in the Schedules is <br />$13,050,372.08. These figures are based on the City estimates included in the "Summary <br />of Estimated Project Costs for the Ramsey Town Center Improvements" which is <br />incorporated herein by reference. The project costs shall be paid for by special <br />assessments, City funds, State funds, Federal funds and County contributions as <br />hereinafter provided. The projects for which the costs are to be shared by the County and <br />the City, the estimated total cost of each project and the County participation in each <br />project is listed in the Schedules of this Agreement. <br />('. The estimated costs for the signal projects are $2,801,250 of which $1,012,500 is on T.H. <br />10. The remaining $1,788,750 in estimated signal costs are on County highways. Since <br />only two of.the signal systems on the County highway system are warranted, the County <br />will not participate in paying for the cost of construction of the unwarranted signals. The <br />county will participate in construction of and will provide ongoing maintenance for the <br />signal systems at Armstrong Boulevard (CSAH 83) at Bunker Lake Boulevard (C.R. 116) <br />and Sunfish Lake Boulevard (CSAIUCR 57) at Bunker Lake Boulevard (CSAH 116), in <br />accordance with the County cost sharing policy. <br />(1) The City shall submit plans for each signal system, including EVP, to the County <br />for review and approval sixty (60) days prior to the advertising for bids. The <br />City shall pay to the County a plan review fee of $1,000 for each signal plan <br />submitted. <br />(2) At a rate of six percent (6 %) of the actual construction costs, the County shall <br />provide construction observation for the construction of the signal system. The <br />County shall have final authority to accept all roadway and signal work done <br />within the county right of way. The estimated cost to the City for construction <br />observation is $107,325. <br />(3) The City shall be responsible for all remaining construction and engineering <br />costs. <br />(4) The cost participation is summarized below: <br />Anoka County: <br />$0 <br />City of Ramsey, Signal Construction Inspection: $107,325 <br />City of Ramsey: ALL REMAINING COSTS <br />(5) The total cost to the City for the signal inspection is estimated at $107,325. . <br />(6) Upon award of the contract for each signal, the City shall pay to the County, <br />upon written demand by the County, ninety five percent (95 %) of its portion of <br />-301- <br />