<br />The project is currently being reviewed for a building permit and revised plans were recently submitted <br />with the storm trunk line shown. The current storm fees for Lot 1 and Lot 7 are $6,577 and <br />$5,631respectively. <br /> <br />Funding: <br /> <br />Potential funding sources for the proposed storm trunk line would be private investment, stormwater <br />management fees, and/or the City's storm water utility fund, depending on discussion. <br /> <br />Op.tions: <br /> <br />1. Require the applicant to pay the entire cost of the improvement to extend a pond outlet from their <br />. site tothe regional basin,. with the pipe .over-sizing to a trunk line paid through the storm water <br />utility fund. <br /> <br />2. Allow the applicant to write down a portion of the initial installation cost of the pond outlet with <br />their storm development fees, and the pipe over-sizing to a trunk line paid through the <br />storrnwater utility fund. <br /> <br />3. Require the applicant to construct the improvements necessary to accommodate their site <br />approval only, with or without their storm fees factored into the discussion. <br /> <br />. <br />4. Require the applicant to initiate the 429 process for an assessment project. <br /> <br />Recommendation: <br /> <br />City staff is recommending. option 2 to remain consistent with the preliminary agreement that was <br />reached at the time the site development application was moving through the approval process. <br />Considerations could also be given for a potential pay back of future connections to the trunk line over <br />time. <br /> <br />Committee Action: <br />Based upon discussion <br /> <br />Attachments: <br /> <br />Alpaca Estates 4th Addition drainage plan <br />Ramsey Commons grading plan <br /> <br />Reviewed by: <br />Public Works Director/Principal Engineer <br /> <br />PW: 4/21/09 <br /> <br />8 <br />