My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/21/2009
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2009
>
Agenda - Public Works Committee - 04/21/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 9:33:06 AM
Creation date
4/17/2009 7:33:05 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/21/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CASE # Ie <br /> <br />DISCUSS SCOPE OF DYSPROSIUM - FLINTWOOD SAFETY IMPROVEMENTS <br />By: Steven Jankowski, City Engineer <br /> <br />Background: <br /> <br />At the February 17, 2009 Public Works Committee meeting staff was directed to prepare a <br />feasibility study for improvements to Dysprosium Street and ,the Flintwood Hills neighborhood <br />that would. increase public safety in this area. Recall that during the discussion of the possible <br />closuresof142~d Avenue between Argon Street and the TH47 frontage road, a number of safety <br />issues and remedies were qfferedby the neighborhood residents. The purpose ofthis case is to <br />receive direction regarding the scope of elements which should be considered in the preparation <br />of that study. Attached to this case is a figure illustrating this area along with the most current <br />traffic volumes. Note that traffic counts shown for 143rd Avenue, 142nd Avenue and 142nd Lane <br />were counts taken on March 9, 2009. <br /> <br />Staff has prepared a cost estimate for the reconstruction of Dysprosium Street between 140th <br />Avenue and 143rd Avenue which would include the narrowing of the street pavement to 38 feet <br />(allowing two travel and two parking lanes), and incorporating a five foot sidewalk on the west <br />side of the street. The cost of this reconstruction is estimated to be $300,000. <br /> <br />The problems pointed out at that meeting include the following: <br /> <br />. Dysprosium inability to handle pedestrians and increasing traffic <br />. Speed <br />. Lack of street lighting <br />. The tight curve on 143rd Avenue and Argon Street <br />. Trees and other obstructions in the sight triangle <br />. Safety of Argon Street pedestrians <br />. Garbage trucks backing down Argon Street south of 142nd Avenue <br />. Bus stop location <br /> <br />. Possible solutions suggested at the February meeting included: <br /> <br />. A three way stop at Argon Street <br />. Speed tables (speed humps) <br />. Sidewalks <br /> <br />.Discussion: <br /> <br />The problem of backing trucks on Argon Street south of 142nd Avenue is an existing condition <br />which cannot be addressed without opening the gate at the south end of Argon Street or <br />acquiring one or more properties to ~onstruct a permanent cuI de sac bulb at this location. Both <br />of these solutions appear to have impacts which would eliminate them from further <br />consideration. The installation of stop signs to control speed has largely been found to be <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.