My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 05/07/2009
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2009
>
Agenda - Planning Commission - 05/07/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:00:07 AM
Creation date
5/1/2009 12:33:35 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
05/07/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />collaborative public workshop to refme the intent and details of the previous ordinance. Staff will <br />schedule the workshop in conjunction with the next Ramsey Resident distribution in July. <br /> <br />Topsoil Ordinance. The City Council adopted an ordinance to establish Topsoil requirements for <br />_ construction of new principal structures. Four ( 4) inches of topsoil meeting certain specifications will be <br />required to be laid whenever. a new principal structure is constructed. This would not apply to new <br />construction of accessory structures if a principal structure already exists. <br /> <br />Board of Appeals. The City Council, acting as the Board of Appeals, approved two requests for metes <br />and bounds subdivisions. City Code defmes requests of these types as procedunil variances and is <br />therefore heard by the Board of Appeals. Typically, all subdivision of property shall be aCcomplished <br />through the platting process. The Board of Adjustment hears variances that are bulk standards in nature, <br /> <br />The first request was to consolidate two parcels owned by LAN D Properties, occupied by the Grosslein <br />Beverage warehouse. A common property line (both parcels owned byL AND Properties) existed <br />through the existing warehouse. The request was approved to clean up ambiguity in _legal versus illegal <br />non-conforming status. The-Board of Adjustment will hear a similar request for a variance to setbacks to <br />residential zones in the near future. - <br /> <br />The second request was to subdivide three properties in order to convey property to the City for right of <br />way purposes through metes and bounds. This is considered a temporary variance in that the City <br />anticipates platting of the. area in the future. The metes and bounds subdivision avoids duplicating <br />platting efforts in the future and allows the City the time to better understand the future development <br />plans of the area. <br /> <br />pc: .05.07.09 <br /> <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.