Laserfiche WebLink
Ktvit t;ur <br />SUPPLEMENTAL AGREEMENT NO. 1 <br />TO AGREEMENT FOR <br />ENGINEERING SERVICES FOR <br />AIRPORT IMPROVEMENTS <br />AT GATEWAY NORTH INDUSTRIAL AIRPORT <br />CITY OF RAMSEY AND <br />HAKANSON ANDERSON ASSOCIATES, INC. <br />S O K si ✓3 1.+ T�t� T ra � �r C <wr <br />7,,rS f, f f <br />The basic - agreement "aa work on Phases I through VII for air- <br />port improvements 4.t l ApSr .(r5 Soga c Ttr y s 9��.� GKdriYs Fov ' <br />.Skc k Lo K >s' r sso ✓,t <br />This supplemental agreement for consultant engineering and planning <br />services for Phase I is an integral part of the aforesaid basic agree- <br />ment dated , 1987. <br />WHEREAS, the Sponsor proposes to make improvements at the GATEWAY <br />NORTH INDUSTRIAL AIRPORT, an Environment Assessment Report and a <br />relocation plan are required in order to determine the impacts and <br />mitigative measures and to develop necessary documentation for <br />acquisition of the airport, <br />WHEREAS, the Sponsor intends to contract for Phase I engineering and <br />planning services for the preparation of the environmental assessment, <br />relocation plan, survey work, preliminary engineering report and pre - <br />application assistance for land acquisition, <br />NOW, THEREFORE, IT IS MUTUALLY COVENANTED AND AGREED AS FOLLOWS: <br />I. The Engineer agrees to furnish and perform the various <br />professional engineering services required for this phase of the <br />project as follows: <br />A. Coordinate the environmental assessment, relocation plan, and <br />assistance with preapplication work with the Sponsor, Mn /DOT, <br />FAA, State and regional clearinghouses, and review agencies as <br />appropriate. <br />B. Conduct the environmental assessment in accordance with <br />Federal, State and local laws and in accordance with FAA <br />Orders 1050.1c and 5050.4 as appropriate. <br />C. Provide 55 copies of the draft and addendum environmental <br />assessment reports for distribution to review agencies, the <br />sponsor and the public. The draft EIAR shall be available for <br />public review at least 30 days prior to the public hearing. <br />D. Attend and present appropriate study information tithe public <br />meeting, two meetings with the Airport Commission.. the <br />meeting with the City Council, the day of the Hearing (pre- <br />hearing) and at the Public Hearing. <br />Te7��/ A'*AZe <br />1 <br />