My WebLink
|
Help
|
About
|
Sign Out
Home
04/08/87
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Agendas
>
1987
>
04/08/87
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 11:00:33 AM
Creation date
5/7/2009 9:34:44 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Airport Commission
Document Date
05/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Respond to comments and/or take appropriate actions in <br />response to comments from review or at the Public Hearings. <br />This level of effort shall be consistent with the allocation <br />of hours outlined in Exhibit A. Substantial effort beyond the <br />hours outlined shall be performed as an additional service. <br />F. Provide 10 copies of the preliminary engineering (Justifica- <br />tion and costs) report and assist with preapplication for AIP <br />funds for land acquisition. <br />G. Provide survey services for airport property surveys to aid <br />with acquisition and preapplication efforts. <br />H. Provide 55 copies of the relocation plan which shall be <br />approvable to all participating agencies and in accordance• <br />with State and local laws and the Federal Uniform Act. ` K� <br />�� ��j.8"r`� a ei <br />I. Provide a cost estimate of the land acquisition program and <br />relocation program for the AIP preapplication. <br />J. Conduct all Phase I relocation /acquisition activities in <br />accordance with the Uniform Act. <br />R. The following services have not been included in the scope of <br />work and may or may not be required of the Engineer. If <br />required, they shall be provided as additional services with <br />an amendment to this agreement: <br />• Assist with preparation of DBE (MBE /WBE) program. <br />• Additional meetings. <br />• Assist with revising building code standards and zoning <br />ordinance to meet MC land use compatibility guidelines. <br />• Detailed implementation plan for noise abatement (MC). <br />• Historic and archaeological survey. <br />• Extensive work on cemetery if determination of adverse <br />affect is made by State Historic Preservation officer <br />and FAA agrees. I�Ak <br />• Other services as may be requested which are not ce <br />identified herein and in Exhibit A. K�f ��(, ;1 d <br />II. Payment for Engineering Services �'�'5ee <br />Payment for the engineering services required fc completion <br />shall be accomplished on the basis of al cost, using <br />hourly rates, and with a fixed fee of 7,587.00 (includes fixed <br />fee of subconsultants) plus reimburse se(s, the total not <br />to exceed $59,585.00 unless an amendment to this agreement is <br />approved by the participating agencies. The basis for payment is <br />presented in attached Exhibit A. <br />Payment to the Engineer shall be made in monthly installments, or <br />? as invoiced, but not more than one (1) per month, in accordance <br />3 with the invoices of engineering services submitted to and <br />approved by the Sponsor. The invoices shall be based on hourly <br />rates plus proportion of fixed fee plus reimburseable expenses. <br />s <br />Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.