Laserfiche WebLink
Reconstruction of Dysprosium Street <br /> Reduce d to 38 feet with Sid ewalk on west s ide <br /> Item Qnty Unit Unit Cost Extensiion <br />1 B618 Conc. Curb & Gutter 2000 ft $ 12.00 $ 24,000 <br />2 Bit Ped Ramps 4 ea $ 300.00 $ 1,200 <br />3 Remove C & G 2000 Ift $ 1.50 $ 3,000 <br />4 Reclaim bit and class 5 10000 sq yd $ 0.80 $ 8,000 <br />5 Prepare road base 20 sta $ 175.00 $ 3,50Q <br />6 Sawcut Bituminous 300 ft $ 2.50 $ .750 <br />7 .Type MV3 Bituminous Base Course 1267 to $ 65.00 $ .82,355 <br />8 Type MV3 Bituminous Wear Course 760 to $ 60.00. $ 45,600 <br />9 Bituminous Materials for Tack Coat 422 gal $ .2.00 $ 844 <br />10 Pavement Stripping. 8000 ft $ 0.44 $ 3,520 <br />11 Repair driveways 12 ea $ 500.00 $ 6,000 <br />12 Topsoil 284 cu yd $ 35.00 $ 9,940- <br />13 Sod 2555 cu yd $ 2.50 $ 6,388 <br />14 Irrigation Repair 25 head $ 35.00 $ 875 <br />15 Install new 2X3 CB 2 ea $ 2,000.00. $ 4,000 <br />16 Concrete Sidewalk 11500 sq ft $ 3.55 $ 40,825 <br />17 Concrete Driveway apron 12 ea $ 1,000.00 $ 12,000 <br /> Tota! Basic Const Cost $ 227, 597 <br /> 30% overhead $ 68,279 <br /> Total Project Cost $ 295,875 <br />-149- <br />