My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/12/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 05/12/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 3:59:02 PM
Creation date
5/7/2009 1:05:35 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/12/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~-a~ <br />Councilrnember introduced the following resolution and moved for its adoption: <br />RESOLUTION #09-OS-XXX <br />RESOLUTION DIRECTING THE PREPARATION OF PLANS AND SPECIFICATIONS <br />FOR IP 08-33 THE BITUMINOUS PAVING OF UTE STREET NORTH OF 179TH LANE <br />WHEREAS, pursuant to a motion of the Ramsey City Council, adopted May 27; 2008, a <br />feasibility study for Improvement Project #08-33 The Bituminous Paving of Ute Street North of <br />179`h Lane has been prepared by Steve Jankowski, City Engineer; and, <br />WHEREAS, the report was received by the Ramsey City Council on March 10, 2009 <br />which <br />WHEREAS, teri days' mailed notice and two weeks' published notice of the hearing was <br />given, and the hearing was held. on .the 14`h day of April, 2009 at Ramsey City Hall 7550 <br />Sunwood Drive NW at 7:00 p.m. at which time all persons desiring to be heard were given an <br />opportunity to be heard thereon; and <br />WHEREAS, the time available for the receipt of a petition opposing the project has <br />expired; and <br />WHEREAS, Section 8.4.1 of the City Charter states that the project may not be ordered <br />for 60 days from the close of the public hearing. <br />NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF <br />RAMSEY, ANOKA COUNTY, STATE OF MINNESOTA, as follows: <br />1) That the improvement is necessary, cost-effective, and feasible as detailed in the <br />feasibility study report. <br />2) That the City Engineer is hereby designated as the engineer for this improvement. <br />3) That the engineer shall prepare-plans and specifications for the making of such <br />improvement. <br />The motion for the adoption of the foregoing resolution was duly seconded by Councilmember <br />and upon vote being taken thereon, the following voted in favor thereof: <br />and-the following voted against the same: <br />and the following abstained: <br />and the following were absent: <br />where upon said resolution was declared duly passed and adopted by the Ramsey City Council <br />this the 12th day of May 2009. <br />ATTEST; <br />City Clerk <br />Mayor <br />RESOLUTION #09-O5-XXX <br />Page 1 of 1 <br />_g~_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.