Laserfiche WebLink
<br /> NORTHSTAR CORRIDOR COMMUTER RAIL <br /> RAMSEY Platform Cost Estimate <br />Sect. No. Descriotion ~Unit QQm Extension FTA see <br />DIVISION 2 <br />2300 Earthwork - Structure Excavation Class E 1,900 CY $ 7.00 $ 13,300 20.01 <br />2300 Earthwork - Granular Backfill (CV) 3,900 CY $ 10.00 $ 39,000 20.01 <br />2870 Site Furnishings-Trash Receptlcles 4 EA$ 4,900.00 $ 19,600 20.01 <br />2870 Shelter Benches 7 EA $ 2,100.00 $ 14,700 20.01 <br />DIVISION 3 <br />3210 Epoxy Reinforcement Bars Grade 60 80,500 LBS $ 1.20 $ 96,600 20.01 <br />3210 Non Epoxy Reinforcement Bars Grade 60 22,000 LBS $ 1.00 $ 22,000 20.01 <br />3220 Welded Wire Fabric 6x6 W2.9xW2.9 7,500 LBS $ 1.00 $ 7,500 20.01 <br />3330 Cast In Place Concrete (Platform) 642 CY $ 490.00 $ 314,600 20.01 <br />3330 Cast in Place Concrete (BNSF Safety Zone Premium) 338 CY $ 110.00 $ 37,200 20,01 <br />3330 Cast In Place Concrete (Platform Slab) 260 CY $ 434.00 $ 112,800 20.01 <br />3330 Cast In Place Concrete (Foundation) 120 CY $ 380.00 $ 45,600 20.01 <br />3330 Integrally Colored Concrete (Platform Slab) 25 CY $ 480.00 $ 12,000 20.01 <br />3330 Composite Deck 1,100 SF $ 11.00 $ 12,100 20.01 <br />3350 Concrete Slab Brushed Surface Finish 8,850 SF $ 1.00 $ 8,900 20.01 <br />3350 Special Surface Finish 1 EA $ 8,900.00 $ 8,900 20.01 <br />3400 Precast Dogbone Bench 5 EA$ 3,250.00 $ 16,300 20.01 <br />3400 Precast Wall Caps 425 LF $ 13.00 $ 5.500 20.01 <br />3480 Detectable Warning Strip 1,754 SF $ 18.50 $ 32,400 20.01 <br />DIVISION 5 <br />5120 Structural Steel 300,000 LBS $ 5.50 $1,650,000 20.01 <br />5120 Architectural Cladding, Elevator Towers 1,400 SF $ 11.00 $ 15,400 20.01 <br />5120 Sun Shades 150 LF $ 22.00 $ 3,300 20.01 <br />5120 Stairs 1 EA $ 81,350.00 $ 81,400 20.01 <br />5521 Pipe and Tube Railings 650 LF $ 110.00 $ 71,500 20.01 <br />DIVISION 6 <br />6160 Gutter 500 LF $ 13.00 $ 6,500 20.01 <br />6160 Low-slope Membrane Roof 950 SF $ 2.00 $ 1,900 20.01 <br />6160 Sheathing-Epicore Roof System 5,500 SF $ 21.00 $ 115,500 20,01 <br />DIVISION 7 <br />7920 Expansion Joint Design E1-1 2,600 LF $ 3.50 $ 9,100 20.01 <br />DIVISION 8 <br />8110 Glass Doors and Steel Frames 10 EA$ 6,500.00 $ 65,000 20.01 <br />8110 Steel Doors and Frames 2 EA $ 2,200.00 $ 4,400 20.01 <br />8450 Glass Curtain Walls 5,600 SF $ 6.50 $ 36,400 20.01 <br />DIVISION 32 <br />32140 Unit Pavers 12,200 SF $ 6.50 $ 79,300 20.01 <br /> BNSF Coordination LS $ 118,348.00 $ 118,300 40.08 <br /> Subtotal Construction $3,077,000 <br /> Total Estimated Project Cost Year 2008 $3,100,000 <br /> <br />Ramsey 30% Plans Cost Estimate 20090217.xls - Platform <br /> <br />Page 3 of 12 <br /> <br />\. <br /> <br />2/26/2009 <br />