My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/09/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 06/09/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 4:00:15 PM
Creation date
6/4/2009 2:16:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/09/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> NORTHSTAR CORRIDOR COMMUTER RAIL <br /> RAMSEY Elevated Walkway Estimate (Parking Ramp Connection) <br />Sect. No. Descriotlon Quantitv J.!Dll .QQm Extension FTA SCC <br />DIVISION 2 <br />2300 Earthwork - Structure Excavation Class E 235 CY $ 7.00 $ 1,600 20.01 <br />2300 Earthwork. Granular Backfill (CV) 145 CY $ 10.00 $ 1,500 20.01 <br />2300 Selective Demolition (Canopy) 1 EA $ 5,000.00 $ 5,000 20.01 <br />DIVISION 3 <br />3210 Epoxy Reinforcement Bars Grade 60 10,000 LBS $ 1.20 $ 12,000 20.01 <br />3210 Non Epoxy Reinforcement Bars Grade 60 16,000 LBS $ 1.00 $ 16,000 20.01 <br />3220 Welded Wire Fabric 6x6 W2.9xW2.9 200 LBS $ 1.00 $ 200 20.01 <br />3300 Cast In Place Concrete (Piers) 40 CY $ 500,00 $ 20,000 20.01 <br />3330 Cast in Place Concrete (Foundation) 90 CY $ 400.00 $ 36,000 20.01 <br />3330 Composite Deck 1,500 SF $ 11.00 $ 16,500 20.01 <br />3350 Concrete Slab Brushed Surface Finish 1,500 SF $ 1.00 $ 1,500 20.01 <br />DIVISION 5 <br />5120 Structural Steel 90,000 LBS $ 5.50 $ 495,000 20.01 <br />5120 Structural Steel (Roof Framing) 9,000 LBS $ 5.50 $ 49,500 20.01 <br />5521 Pipe and Tube Railings 300 LF $ 110.00 $ 33,000 20.01 <br />DIVISION 6 <br />6160 Gutter 300 LF $ 13.00 $ 3,900 20.01 <br />6160 Low-slope Membrane Roof 3,000 SF $ 2.00 $ 6,000 20.01 <br />6160 Roof System 3.000 SF $ 21.00 $ 63,000 20.01 <br />DIVISION 7 <br />7920 Expansion Joint Design E1-1 20 LF $ 3.50 $ 100 20.01 <br />DIVISION 8 <br />8110 Glass Doors and Steel Frames 2 EA $ 6,500.00 $ 13,000 20.01 <br />8450 Glass Curtain Walls 3.000 SF $ 6.50 $ 19,500 20.01 <br /> Subtotal Construction $ 800,000 <br /> Total Estimated Project Cost Year 2008 $ 800,000 <br /> <br />Ramsey 30% Plans Cost Estimate 20090217.xls - Elevated Walkwafage 4 of 12 <br /> <br />2126/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.