My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/09/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 06/09/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 4:00:15 PM
Creation date
6/4/2009 2:16:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/09/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br />NORTHSTAR COMMUTER RAIL. PROJECT <br />Average Unit Costs <br /> <br /> Proposed Unit March <br />MnDOT No. Item OescrlDtlon Unit Price 12008$\ Average Cost Source Comments <br /> Station NamelDestination Sian IPA3\ EA $ 520.00 Flemin Desian w/20% Mark-un <br /> Directional Sian-iPA4\ EA $ 260.00 Flemin Desion w/20% Mark-un <br /> Station Name Vinvl on Buildinn (PA.5\ EA $ 260.00 Flemin Desion w/20% Mark-un <br /> Ticket Vinvl on Bulldinn IPA.6 EA $ 260.00 Flem!n Deslan w/20% Mark-un <br /> Svmbol Flaa Sian IPA7\ EA $ 260.00 Flemina Deslan w/20% Mark-uo <br /> Wavlind!na Sian Vinvl on Buildina (PA8\ EA $ 260.00 Flemina Desian w/20% Mark-uo <br /> Wavfmdina Sian Vinvl on Aluminum Sian (PA.8\ EA $ 416.00 Flemina Desian w/20% Mark-uo <br />. Emeraencv Phone Flaa IPA.9) EA $ 416.00 Flemina Desian w/20% Mark-un <br /> Paid Fare Zone Sian IPA.10) EA $ 208.00 Flemlna Desian w/20% Mark-oo <br /> Prohibited Behaviors Sian IPAll) EA $ 260.00 Flemina Desian w/20% Mark-un <br /> No Smokina Sian (PA12\ EA $ 31.20 Flemina Desian w/20% Mark-un <br /> Salvaae Bike Rack EA $ 156.00 RS Means <br /> Salvaae Bike Lockers EA $ 208.00 RS Means <br /> Bike Racks EA $ 624.00 $ 600.00 RS Means <br /> Bike Lockers EA $ 1 300.00 $ 1 250.00 Metro Transit <br /> Install Bike Rack EA $ 124.80 RS Means 2 oeople at $60/hr <br /> Install Bike Lockers EA $ 156.00 RS Means 3 "aoola at $75/hr <br /> New Track TF $ 166.40 LTK Track Cost <br /> S08cial Track Work - No.9 Turnout EA $ 62400.00 L TK Track Cost <br /> Soeclal Track Work - No. 11 Turnout EA $ 166,400.00 DMJM+Harris Track Cost <br /> Switch Machines and BNSF Controls EA $ 31 200.00 DMJM+Harrls Track Cost <br /> Track Gradlna TF $ 69.68 Same as common ex. <br /> Irrlaation SF $ 0.78 $ 0.75 MAC Proiects 2005 <br /> Protect Railroad Structure LS $ 1 040.00 <br /> Protect Utilities Under Platform LS $ 520.00 <br /> Temo Track Removal/Reolacement TF $ 208.00 <br /> Tunnel Construction Staaina DAY $ 41 600.00 <br /> <br />Ramsey 30% Plans Cost Estimate 20090217.xls . Avg. Prices <br /> <br />Page11of12 <br /> <br />2/26/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.