Laserfiche WebLink
<br />'J< <br /> <br />/ <br /> <br />B. Total estimated construction cost of the hnprovements described in the Schedules is <br />$13,050,372.08. These figures are based on the City estimates included in the "Summary <br />of Estimated Project Costs for the Ramsey Town Center Improvements" which is <br />incorporated herein by reference. The project costs shall be paid for by special <br />assessments, City funds, State funds, Federal funds and County contributions as <br />hereinafter provided. The projects for which the costs are to be shared by the County and <br />the City,.the estimated total cost of each project, and the County participation in each <br />project is listed in the Schedules of this Agreement. <br />C. The estimated costs forthe signal projects are $2,801,250 of which $1,012,500 is on T.H. <br />10. The remaining $1,788,750 in estimated sig:nal costs are 01;1 County highways. Since <br />only two of the sign~l systems on the County highway system are warranted, the County <br /> <br />, ' <br />will not participate in paying for the cost of construction of the unwarranted signals. . The <br />county will participate in construction of and will provide ongoing maintenance for the <br />signal systems at ArmstrongBoulevard (CSAR 83) at Bunker Lake Boulevard (C.R. 116) <br />and Sunfish Lake Boulevard (CSAH/CR 57) at Bunker Lake Boulevard cCSAR 116), in <br />accordance with the County cost sharing policy; , <br />(1) The City shall submit plans for each signal system, including EVP, to the County <br />for review and approval sixty (60) days prior to the advertising for bids. The <br />City shall pay to the County a plan review fee of $1,000 for each signal plan <br />submitted. <br />(2) At a rate of six percent (6%) of the actual construction costs, the County shall <br />provide construCtion observation for the construction of the signal system. The <br />County shall have final authority to ac'cept all roadway and signal work done <br />within the county right of way. The estimated cost to the City for construction <br />observation is $107,325'- <br />(3) The City shall be respons.ible for all remaining construction and engineerillg <br />costs. <br /> <br />(4) The cost participation is summarized below: <br />Anoka County: $0 <br />City of Ramsey, Signal Construction Inspection: $107.325 <br />City of Ramsey: ALL REMAINING COSTS <br />(5) The total cost to the City for the signal inspection is estimated at $107,325. <br />(6) 'Upon award of the contract ~or each sigilal, the City shall pay to the County, <br />upon written demand by the County, ninety five percent (95%) of its portion of <br /> <br />8 <br />