Laserfiche WebLink
<br />D. The view shed from the park to the RTC development should be considered. To the <br />extent possible, plant materials should be used to screen the view of buildings or other <br />man-made structures. Consideration of evening uses of the park should also be <br />considered in lighting of the RTC development. Light cast into the park or that is visible <br />from the park will have a long-term detrimental impact on use of the park for evening <br />activities. <br /> <br />E. The RTC design should preserve a wildlife corridor between Lake ltaska and the <br />Mississippi River. To that. end, provisions should be made in the design, development of <br />the RTC and the future park to ensure continuity in both the alignment and natural <br />characteristics of the wildlife corridor. <br />F. The City shall facilitate meetings prior to detailed design, to explore possibilities for <br />achieving harmony in the architectural vernacular between the RTC development and the <br />future park development, particularly where the two projects will interface, e.g. lighting, <br />site furnishings, landscaping, etc. <br />G. The design of the storm sewer system throughout the development and along the outfall <br />to the Mississippi River will provide for adequate capacity for the county roadways in <br />and around the development area including all roadways and ditches that now naturally <br />drain toward the intersections of Bunker Lake Boulevard (C.R. 116) with Armstrong <br />Boulevard (C.S.A.H. 83) and Ramsey Boulevard (C.R. 56), along with all county <br />highways and intersections between Bunker Lake Boulevard and Highway 10, inclusive <br />of Armstrong Boulevard and Ramsey Boulevard. Adequate storage and drainage systems <br />will be provided by the City for the ultimate section of each of those roadways listed <br />above in their final configuration as anticipated by this Agreement. <br /> <br />7. COSTS <br />A. (Tne contract cost of th~,-;-J the work is not co~tractecnJjeco~t _of ,:llliibOr.7 <br />~aterials-;-norma:j'engii'i"eerin"""i'COsts, equipment rental requiredlO do lheworK and righJ <br />(Of -way acq uisiliiSilcostssnaU"1:-0nstitute"tIie actUar"~tion costs" ~l~ so' <br />~ -~.---- - ..... <br />referred to herei~Total Construction Costs shall include constructiOi1"'Co"StS"'ail41 <br />Qillllinistrati:Ve.'costs sucii"aSb~;fu;.~p;nses, legal expenses ana e~gin~g fees,! <br />provided however, that said administrative costs shall not exceed 26 percent (26%) of the <br />construction costs. "Estimated total construction costs" are good faith projections of <br />costs which will be incurred for the projects. <br /> <br />7 <br />