My WebLink
|
Help
|
About
|
Sign Out
Home
09/29/09 Special Meeting
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Finance Committee
>
Agendas
>
2000's
>
2009
>
09/29/09 Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 3:04:47 PM
Creation date
9/25/2009 10:50:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Finance Committee - Special
Document Date
09/29/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />I.SA Design, ",(. <br />On!: Financial Pliil~a <br />120 S, Sixth Street <br />SUilll 1100 <br />Minl'1OlIpoli$. MN 55402 <br />T. 612.339,8'129 <br />F. 612.339.7433 <br />www.lsadesigninc.com <br /> <br />Planning <br />Architecture <br />Urban Design <br /> <br /> <br />To: <br />From: <br />Project: <br />Subject: <br />Date: <br /> <br />Srian Olson <br />Bill Fossing, P.E. <br />Ramsey Town Center <br />'Parking Ramp 200 Stall Expansion <br />August 26, 2009 <br /> <br />We are pleased to submit this proposal for anew contract for the following services. Our <br />work will include Architectural. Engineering and Consulting services for the expansion of <br />the City owned structured parking facility to ensure that the City retains its rights to the <br />CMAQ Grant funding for the project. <br /> <br />PROJECT UNDERSTANDING <br /> <br />The City of Ramsey currently owns a 560 car parking structure adjacent to City Hall that <br />was completed in 2006. At the time of the initial design effort, the City authorized LSA <br />Design to complete Schematic Design documents for an additional 200 stalls for the <br />structure. The purpose of this design exercise is to: <br /> <br />. Complete Final Design documents for the 200 stall expansion <br />· Deliver all necessary DCP and project development documentation to <br />MnDOT necessary to meet the funding requirements and project sunset <br />date. <br />· We are currently estimating that a Preliminary Construction Budget for <br />this project is $3,600,000 according to the CMAQ Grant <br /> <br />SCOPE OF SERVICES <br /> <br />LSA Design will be the lead design professional with responsibilities including <br />architectural, structural engineering, mechanical engineering, electrical engineering, civil <br />engineering, landscape architectural, and functional design services. The scope of <br />service also includes coordination with adjacent developments. <br /> <br />MnDOT/CMAQ Initiation Submittals ~ <br />" LSA will complete the submittals for the Delegated Contracting Process (DCP), a <br />Project Memorandum (PM), revisions to the existing Categorical Exclusion (CE) that <br />are required for MnDOT review and approval. <br />" We will verify that the proposed footprint of the original Phase II planning documents <br />are still accurate to confirm there will be no additional right of way requirements and <br />will re~submit ROW Certificate #1. <br /> <br />SO/Desion Development: <br />" Develop the Schematic Design for new project elements including a new western <br />stair tower. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.