My WebLink
|
Help
|
About
|
Sign Out
Home
09/29/09 Special Meeting
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Finance Committee
>
Agendas
>
2000's
>
2009
>
09/29/09 Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 3:04:47 PM
Creation date
9/25/2009 10:50:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Finance Committee - Special
Document Date
09/29/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />WALKER <br />PARKiNO CONSULTANTS <br /> <br />September 16, 2009 <br /> <br />Mr. Brion Olson, f.E. <br />Director of Public Works/Principal City Engineer <br />City of Ramsey <br />7550 Sunwood Drive Northwest <br />Ror:nsey, MN55303 <br /> <br />Re; Proposal for Professional Services <br />City of Ramsey Municipal Park & Ride Facility Expansion <br />Ramsey, Minnesota <br /> <br />Dear Brian; <br /> <br />Walker Parking Consultants <br />1660 S. Highway 100. Suite 350 <br />Minneapolis. MN 55416 <br /> <br />Vail;e: 952,595,9116 <br />Fox: 952.5959518 <br />www.wa1kerparking.com <br /> <br />Walker Parking Consultants (WPC) is very pleased to offer our 44 years of parking facility expertise <br />to the City of Ramsey for the proposed parking Municipal Park & Ride Facility Expansion in Ramsey, <br />Minnesota. We have prepared a proposal for providing A/E Design Services to ensure the city <br />retains the CMAQ Grant funding for this project. <br /> <br />We are very excited aQout the opportunity to be able to work with the City of Ramsey to develop a <br />facility that will be well coordinated and integrated both architecturally and functionally with the <br />existing ramp and proposed adjacent development. Walker Parking Consultants will be the lead <br />design professional and team with LANDFORM and Hay Dobbs to provide full architectural, civil, <br />structural, mechanical, electrical, and landscape architectural services. <br /> <br />PROJECT UNDERSTANDING <br /> <br />The City of Ramsey plans to expand the 560 space parking facility that was constructed in 2006. The <br />initial design did include complete schematic design documents for the 200 space expansion. This <br />project will consist of final construction documents for the multi-level parking structure expansion. Our <br />architectural design will conform to the expression developed. <br /> <br />We understand that an RFP is out for an adjacent project. The location and size of that project has <br />not been finalized. Out work will include coordinating with that project, <br /> <br />PROJECT APPROACH <br /> <br />We will work closely with the City and adjacent proposed development to complete, the <br />MnDOT/CMAQ submittals, develop a schematic design for the new western stair/elevator tower and <br />complete con'struction documents such that the project is ready for bidding to meet SMAQ schedule <br />requirements. <br /> <br />M: \_PROPOSAL \Proposal 2009\City of Ramsey\Prop 091609 Olsan.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.