Laserfiche WebLink
<br /> OPTION A <br /> Reconstruction of Dysprosium Street <br /> 38 feet wide - Parking Lanes Both Sides <br /> Item Qnty Unit Unit Cost Extension <br />1 Mobilization 1 Is $ 10,000.00 $ 10,000 <br />2 Traffic Control 1 Is $ 5,000.00 $ 5,000 <br />3 Remove C & G 3485 ft $ 1.50 $ 5,228 <br />4 Reclaim bit and class 5 9500 sq yd $ 0.80 $ 7,600 <br />5 Prepare road base 19 sta $ 175.00 $ 3,325 <br />6 Sawcut Bituminous 240 ft $ 2.50 $ 600 <br />7 B618 Cone. Curb & Gutter 3485 ft $ 12.00 $ 41,820 <br />8 Choker 15 ea $ 400.00 $ 6,000 <br />9 4" Concrete Sidewalk 24450 sq ft $ 3.55 $ 86,798 <br />10 Concrete Driveway apron 24 ea $ 600.00 $ 14,400 <br />11 Repair driveways 24 ea $ 500.00 $ 12,000 <br />12 Bit Ped Ramps 32 ea $ 400.00 $ 12,800 <br />13 Class 5 2328 ton $ 12.00 $ 27,936 <br />14 Type MV3 Bituminous Base Course 888 tn $ 65.00 $ 57,720 <br />15 Type MV3 Bituminous Wear Course 666 tn $ 60.00 $ 39,960 <br />16 Bituminous Materials for Tack Coat 370 gal $ 2.00 $ 740 <br />17 4"double yellow expo?<y stripping 1900 ft $ 0.40 $ 760 <br />18 4" white epoxy stripping 3050 ft $ 0.20 $ 610 <br />19 Common borrow 250 cu yd $ 7.50 $ 1,875 <br />20 Topsoil 468 cu yd $ 35.00 $ 16,380 <br />21 Sod 4230 cu yd $ 2.50 $ 10,575 <br />22 Trees 96 ea $ 300.00 $ 28,800 <br />23 Irrigation Repair 100 head $ 35.00 $ 3,500 <br /> Total Basic Canst Cost $ 394,426 <br /> 30% overhead $ 118,328 <br /> . Total Project Cost $ 512,754 <br />