My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/20/2009
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2009
>
Agenda - Public Works Committee - 10/20/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 9:35:11 AM
Creation date
10/15/2009 3:09:19 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/20/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> OPTION B <br /> Reconstruction of Dysprosium Street <br /> 32 feet wide. Parking Lane West Side Only <br /> Item Qnty Unit Unit Cost Extension <br />1 Mobilization 1 Is $ 10,000.00 $ .10,000 <br />2 Traffic Control 1 Is $ 5,000.00 $ 5,000 <br />3 Remove C & G 3485 ft $ 1.50 $ 5,228 <br />4 Reclaim bit and class 5 9500 sq yd $ 0.80 $ 7,600 <br />5 Prepare road base 19 sta $ 175.00 $ 3,325 <br />6 Sawcut Bituminous 240 ft $ 2.50 $ 600 <br />7 B618 Cone. Curb & Gutter 3485 ft $ 12.00 $ 41,820 <br />8 Choker 6 ea $ 400.00 $ 2,400 <br />9 4" Concrete Sidewalk 24450 sq ft $ 3.50 $ 85,575 <br />10 Concrete Driveway apron 24 ea $ 600.00 $ 14,400 <br />11 Repair driveways 24 ea $ 500.00 $ 12,000 <br />12 Bit Ped Ramps 22 ea $ 400.00 $ 8,800 <br />13 Class 5 1950 ton $ 12.00 $ 23,400 <br />14 Type MV3 Bituminous Base Course 735 tn $ 65.00 $ 47,775 <br />15 Type MV3 Bituminous Wear Course 551 tn $ 60.00 $ 33,060 <br />16 Bituminous Materials for Tack Coat 310 gal. $ 2.00 $ 620 <br />17 4"double yellow expoxy stripping 1900 ft $ 0.40 $ 760 <br />18 4" white epoxy stripping 3050 ft $ 0.20 $ 610 <br />19 Common borrow 460 cu yd $ 7.50 $ .3,450 <br />20 Topsoil 468 cu yd $ 35.00 $ 16,380 <br />21 Sod 4230 cu yd $ 2.50 $ 10,575 <br />22 Trees 96 ea $' 300.00 $ 28,800 <br />23 Irrigation Repair 100 head $ 35.00 $ 3,500 <br /> Total Basic Const Cost $ 365,678 <br /> 30% overhead $ 109,703 <br /> Total Project Cost $ 475,381 <br />
The URL can be used to link to this page
Your browser does not support the video tag.