My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/10/2009
Ramsey
>
Public
>
Agendas
>
Council
>
2009
>
Agenda - Council - 11/10/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 4:22:48 PM
Creation date
11/5/2009 2:06:49 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/10/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />illustrates the existing street profile along with both of these options. Boulevard trees <br />would be installed on both sides of the street at 50 foot intervals. <br /> <br />Under both Options A and B the street modifications would begin 150 feet north of 140tl1 <br />A venue since thjs is the point at which the street section transitions into the additional <br />lanes required for the CR 116 intersection. The street modifications would again taper <br />back into the existing section north of 143rd Avenue. The sidewalk on the west side <br />would connect between the existing bituminous trail at CR 116 and the existing <br />bituminous trail located at the southwest corner of Terrace Hill apartment. On the east <br />side of Dysprosium the sidewalk will connect from the sidewalk on the Savanna Oaks <br />apartment building south to the north side of 140th A venue wh~!,~itft:;wQuld connect to a <br />trail on the south side of this intersection. . A){' <br /> <br />~,.;~~~~ ~~~ .' <br />Although similar sidewalk improvements were c(;msidyr&~1for 1'4~~~yenue and Argon <br />',"," '.',,;. <,...~~._;\':{.. <br />Street, both of these streets have setbacks of as litt!~~a8:?4,f. reet betw~ft:he curb and the <br />residences. Placement of a sidewalk with even a niodest width terrace" ", .'ct restrict ' <br />y~ ,y <br />driveway parldng to a single vehicle. There ar,~ti~~Rnsidera11!e number of' ,..~i,;~~Jes stored <br />within the driveways 011 these streets. As an aIterti: .... ., t~':r~'posed that p.#lclng be <br />restricted on the north and east sides of these streets hite strip demarcate a <br />walldng / bicycle lane. <br /> <br />''';~tt1h, <br />This project will reconnect each existirt' . ;. ~ opening t8~~~~;fiewly paved street. The <br />~ ~.WA~~ <br />driveway approaches between the street 6.\1' "~,walk sh~i1T be replaced with <br />concrete at a standard width-of 18 feet. The.\drly;ew ,,'::'ent beyond the sidewalk <br />shall be neatly saw CU!)W([;;tlRl.~~ped with th~~~lme mat~f1a:i and in the same width as the <br />existing driveway. ."'" ';'toratioi1~l~~ll.inc1ude t1W protection or repair of any in'igation ' <br />systems or invisib1t .~. Mail~1fbxes may be '~~JR,cated to accommodate construction but <br />shall be returned to thel ':'~~igi~~1~l~,~~iR.~s upo~ifermination of the project. Disturbed turf <br />areas shall h~'%.e.$.:tQrJ,~p wiffi:l~llsoiraYia::s:Q;a~~~$' <br />'li~~~~'1;:$'}:'{'::;:':;:~~~i'l~ ":':*\i~~1~:;,. '" """}' <br />EST~~TED COSTS{{::;:::; ":::;::<,:::;"..",4' <br />,~,~:i;::~\::~~t~~~::~'~%~r~~ ,:~~:s:~~' <br />The cost (ft~1\' project inC'~!\E:ling d"'erhead is estimated to be $512,754 for Option A, and <br />$37,373less ~:::o;~ption B. .~etai1s oftbe project construction cost are presented in . <br />Appendix A. Tll~~J.l)ject ~~hhead, which adds an additional 30 % of the construction <br />cost include the fon~j!g~" <br />':~i~~'< <br />· Engineering aesign <br />. Project administration <br />. Bonding and legal <br />. Inspection and testing <br />. Contingencies. <br /> <br /> <br />8% <br />5% <br />2% <br />5% <br />10% <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.