Laserfiche WebLink
9.50.50 <br /> <br />As-built Plans. Upon completion of installation of all required <br />improvements, the'~subdivider shall file with the City. copies of plans and <br />specifications showing all improvements as finally constructed and installed <br />in both distal and paper form as required by the City Engineer. Such as- <br />built drawings shall be certified to be true and accurate by the registered <br />engineer responsible for the installation of the improvements. <br /> <br /> 9.50.50 <br />Stage I Financial Surety. All sums deposited with the City in a ......... <br />with this Section shall be kept in separate funds which funds shall be <br />encumbered and earmarked for the later construction of the particular <br />improvements within the particular Subdivision. These funds are deposited <br />into a non-interest barring fund. <br /> <br /> Snbd. 4. Stage II Improvements. The following items shall be installed by <br />the CiD' or Subcontractors, at the expense of the subdivider. <br /> <br />Street Striping And Si~o-ning. Street signage shall include street name, <br />traffic control, and advisory signs. Street striping shall be completed on all <br />major thoroughfares, commercial and industrial streets as required by the <br />City Engineer. Striping shall be completed after sealcoating is done. <br /> <br />Sealeoating. Within five years after the construction of the streets, the City <br />shall sealcoat the streets in accordance with City specifications. <br /> <br />Street Lights. After consultation with the provider of electrical services, <br />the City Engineer shall place within the development agreement, a street <br />light construction plan which will then be constructed as a Stage II <br />Improvement, the cost of purchase, installation and three year's operation <br />and maintenance thereof being included within the development agreement <br />as a Stage II Improvement. <br /> <br />Inspection. The installation of the above improvements shall be under the <br />control and supervision of the City Engineer who shall speci~ the manner <br />in which such installations shall be made. <br /> <br />Monuments. No final plat shall be approved by the Council unless the <br />owner or subdivider shall have placed and installed survey monuments of a <br />permanent character at all points as shown on the final plat as required by <br />the Engineer and County Surveyor. All United States, state, county or other <br />offician bench marks, monuments or triangulation stations in or adjacent to <br />the property shall be preserved in precise position. <br /> <br />Stage II Cash Deposit. All sums deposited with the City in accordance <br />with this Section shall be kept in separate funds which funds shall be <br />encumbered and earmarked for the later construction of the particular <br /> <br /> 9.50 Subdivision Regulations <br />-328- <br /> <br />9-40 <br /> <br />August 2003 Draft <br /> <br /> <br />