Laserfiche WebLink
<br />;;l <br /> <br />CITY COUNCIL WORK SESSION <br />Topic Report: 2010 Street Reconstruction <br />Assessment Discussion <br />By: Tim Himmer, City Engineer <br /> <br /> <br />Background: <br /> <br />The City's 2010 - 2014 Capital Improvement Program (CIP) includes a few street reconstruction <br />projects scheduled for 2010. Staff is currently working through the process of drafting feasibility <br />studies and meeting with the residents on these proposed projects, but there has been no formal <br />direction related to assessments. Staff cannot complete their work and accurately inform the residents <br />of associated costs without this formal direction of City cost participation. Currently the only <br />assessment policy the City has in place is related to street maintenance (sealcoats and overlays). Due <br />to the higher costs associated with reconstruction projects an assessment policy should be developed <br />for these types of road improvements. <br /> <br />Based upon previous Council direction staff is currently investigating alternative funding options for <br />future infrastructure projects, but this will take some time and a decision will most likely not be <br />reached in time to include with these 2010 projects. The attached projects are scheduled for next year <br />and a decision must be made on an appropriate assessment amount so staff can complete the required <br />information and adequately inform the residents that are proposed to be assessed. <br /> <br />Action Statement: <br /> <br />Based upon discussion <br /> <br />Attachments: <br /> <br />Dysprosium Street Information <br />Now and Then Estates Information <br /> <br />Reviewed by: <br /> <br />IMecrorOfPubliCWOmCiW~.. - <br />CIty Administrator ~~ <br /> <br />CCWS: <br /> <br />12/8/2009 <br />